5
Preparing to Install the Lift
Final Site Inspection
Verify the surface the lift will mount to is smooth and level. This surface must be made from 3,500 psi reinforced concrete with a minimum thickness of 4”.
Verify that there is enough space for the lifts foot print. Be sure to include space for the folding access ramp. (49” x 69”)
Caution: Verify that the running clearance around the lift complies with any codes for your area.
•The horizontal gap between the edge of the platform and the upper landing must no less than 3/8” and no greater than 3/4”.
•The horizontal gap between the guard panel and any wall or barrier must be no less than 2” and no greater than 3”.
•It is recommended that a gate or door be installed at the upper landing.
•Verify that sufficient head room exists above the lift. The lift will require 6’ 8” of clearance above the platform floor when the lift is at the upper landing.
Warning: The area between the floor where the lift is mounted and the top
landing must be covered by a smooth vertical fascia. This is to to eliminate any pinch points between the platform and landing.
Connecting to Electricity
The lift will require a 115 VAC 20 amp grounded electrical outlet within 6 feet of the lift.
Plug the lift directly into the power outlet. Do not plug anything else into same outlet as the lift.
Warning: Do not ride on the lift until it has been anchored in place.
Controller Harness Connections
High Voltage
Circuit Breaker
(AC unit only)
Upper & Lower
Call‐Sends
Safety Pan
Jumper
Upper & Lower Limit Switches
Low Voltage
Circuit Breaker
Platform
Traveling Cable
Upper Landing
Interlock