SMA/SMH 18/24 | INSTALLATION INSTRUCTIONS | Heat Controller, Inc. |
AIR PURGE AND TEST OPERATION
1. Air Purge
where L=Length
•Open the valve stem until it hits against the stop. Do not try to open it further.
•Securely tighten the valve stem cap with a spanner or wrench.
•Torque the valve properly:
Gas pipe side (0.38"): 23.5
Liquid pipe side (0.25"): 12.56
A. Completely tighten the flare nuts A, B, C, D. Connect the manifold valve charge hose to the charge port of the packed valve on the gas pipe side.
B. Connect the charge hose to the vacuum pump.
C.
D.
is entering.
E.
F.
G.
H.
-
Lo Handle
Hi Handle
11