Operation
5.Examine follow plate to make sure rubber grommet
(c)is in place in center of the plate (FIG. 7).
7.Insert pump drop tube through center of rubber grommet in follow plate (FIG. 9).
Se
c
FIG. 7
6.Set follow plate on top of fresh grease (FIG. 8). Remove air by pushing on the follow plate until the grease level is flush with the opening in the middle of the follow plate (d).
d
FIG. 9
8. Tighten thumb screws (a) to secure cover to drum.
a
FIG. 8
FIG. 10
9. For the pump that is connected, trigger the dispens-
ing valve into a grounded metal waste container making firm,
10. Slowly open the
3A1334E | 13 |