INSTALLATION | ||
|
|
|
4. Remove the red arm from the crate.
5.Remove the two 3/8" lag bolts from the base of the stanchion. Note: Do NOT remove the steel strap until the stanchion has been secured.
7.Lift the stanchion assembly off the ground and move to desired location.
8.Secure the stanchion to the floor per qualified engi- neer specifications or secure the stanchion to the optional platform. If using the platform, level the platform before installing the stanchion. Install and secure at least 300# of weight onto the platform. A welding power source may be sufficient for this pur- pose. Verify the weight of the power source.
6.Secure an adequate nylon strap or rope to the top of the arm. Loop the strap behind the red mounting triangle where it attaches to the pivot clutches. Slowly lift the arm out of the crate.
15.2”
15.2”
18”
9.Remove the six 1/2" x
WELDING ARMS