Anton/Bauer DUAL 2702, QUAD 2702 Priority Battery Function, DDM DIAGNOSTIC/DISCHARGE Module

Page 10

Priority Battery Function

A unique operating feature of all PowerChargers allows the operator to select any battery on any charge position as a PRIORITY BATTERY. While connecting a battery to any charge position, hold the DISPLAY button until an audible indication sounds and the LCD indicates:

PRIORITY BATTERY

The PowerCharger will interrupt the charging of any other battery and address the Priority Battery immediately (assuming it is within a safe charging parameters). When priority charging is complete, the charger will return to addressing the other batteries on the charger.

NOTE: This function is unavailable if the AUTOCAL mode has been requested by the charger.

DDM (DIAGNOSTIC/DISCHARGE MODULE)

(standard on Model DUAL 2702 and QUAD 2702)

The DDM is a modular addition which will upgrade any InterActive 2000 PowerCharger to a complete battery management system. A standard feature with the DUAL 2702 and QUAD 2702, the DDM can be easily added to any model PowerCharger, at any time. With this module installed, the PowerCharger becomes a complete battery management system, capable of testing battery capacity and identifying battery anomalies before they appear in the field.

The DDM will perform a standard or a 24 hour test. The standard test is a full charge-discharge-full charge routine, which will identify the capacity of the battery and indicate any performance issues, such as low battery voltage indicating a shorted cell. The 24 hour test is a full charge-wait 24 hours-discharge-full charge routine which will identify any excessive self-discharge or serious cell imbalance condition.

Test time will vary with battery condition. The standard test will require a minimum of 6 hours to a maximum of about 12 hours. The 24 hour test will require an additional 24 hours as the battery undergoes a 24 hour rest time to identify self-discharge anomalies. It is recommended that the 24 hour test be performed only on weekends or when the battery is not scheduled to be used for 2-3 days.

8

Image 10
Contents PowerCharger Table of Contents Standard Features IntroductionImportant Notice GROUNDING/EARTHING SafeguardsFuse TYPE/REPLACEMENT OperationCharging Applications Three Stage Charging Methodology Propac Wait 2-READY 3-CHARGE 4-READYVCO LED Indications LED Indication MeaningDDM DIAGNOSTIC/DISCHARGE Module Priority BatteryPriority Battery Function Standard on Model Dual 2702 and QuadTo Operate The PowerCharger with DDM Autocal Feature Camera Power Mode is on Batteries not Charging Operation AS DC Camera Supply from MainsPower Loss Memory Mode Power DownFCC Notice Warranty