Grizzly G0524 owner manual Grounding Rewire To Phase

Page 9

Grounding

Rewire To 440V

 

(3-Phase)

 

Electrocution or a fire can result if the bandsaw is not grounded cor- rectly. Make sure all electrical circuits are grounded. DO NOT use the machine if it is not grounded.

In the event of an electrical short, grounding pro- vides electric current a path of least resistance to reduce the risk of electrical shock to the opera- tor. Ground the power cord and this machine in accordance with all local codes and ordinances.

Operating this machine when it is not properly grounded can result in electric shock or electro- cution.

The Model G0524 can be rewired for 440V 3- phase operation. This rewiring job consists of disconnecting the rip saw from the power source, changing the connections on the voltage trans- former, changing the overload relays for the motors, and rewiring the motors.

The necessary overload relays for this procedure can be purchased in the Model G0524 440V Conversion Kit (P/N P0524067) by calling our customer service number at (800) 523-4777.

This procedure takes moderate electrical skill and the rewiring job must be inspected by a licensed electrician before the saw is connected to the power source.

To rewire the Model G0524 to 440V 3-Phase:

1.Disconnect the rip saw from the power source!

2.Open the electrical box.

3.Remove the wire labeled “R” at the 220V ter- minal of the power transformer and connect it to the 440V terminal (Figure 2).

220V Terminal

440V Terminal

Figure 2. The “R” wire is connected to the 440V terminal post to operate the rip saw on a 440V 3-phase power source.

G0524 Rip Saw

-7-

Image 9
Contents Model G0524 RIP SAW Page Table Of Contents Safety Instructions for Power Tools SafetyLength Additional Safety Instructions for Rip Saws Commentary IntroductionVoltage & Amperage Draw Circuit RequirementsCircuit Breaker Connection TypeGrounding Rewire To Phase V main motor wiring External Features Features & ControlsOil Reservoir Access Door -Provides Blade Height Handwheel -AdjustsMain Motor Start Button-Starts the saw blade Control PanelAbout this Section Unpacking SET UPDescription Loose Parts InventoryAuxiliary Roller Box Contents Circle Site Considerations Clean Up Floor LoadWorking Clearances To connect the power cord to the saw Placement Power CordRemove The Blade Test Run Do not re-install the arbor bolt or flange at this timeScale Calibration Disconnect the machine from the power sourceDust Collection Auxiliary Rollers Components and Hardware Needed QtyTools Needed Auxiliary roller bracket Operations Safe OperationPlease follow these tips Every time the saw is operated Conveyor track must be moving when adjusting the feed rate Adjusting Feed RateDisconnect the saw from the power source Rip CuttingPage Schedule MaintenanceGrease Fittings Gear BoxBearings Belts Lube SystemDate Approximate Hours Of Use Maintenance Performed Maintenance LogAbout Service Service AdjustmentsTo adjust the fence alignment Fence AlignmentBelt Tension Fence Ride Height To adjust the ride height of the fencePressure Rollers Gibs Gib adjustment setscrews G0524 Rip SawDate Approximate Hours Of Use Service Performed Service LogOxiSolv Blade & Bit Cleaner G1955 Aftermarket AccessoriesReference Info GeneralInventory Qty Laser Guide with Arm H5749Machine Data Sheet 51 54 50 Description G0524 Rip Saw SPEC. EYE-BOLT M16-2 X 90LH 214 Special Washer 12 X 30 X 5MM RipSaw PSS02M SET Screw M6-1 X G0524 Rip Saw PSB92M Spring Plank G0524 Rip Saw Relay MY2NJ-200/220VAC PSB48M Symptom Possible Cause Corrective Action TroubleshootingG0524 Wiring Diagrams G0524 Rip Saw G0524 Rip Saw Warranty & Returns Warranty Card BOX BELLINGHAM, WA Grizzly INDUSTRIAL, INCPage Call Today For a Free Full Color Catalog