Hobart Welding Products OM-279 manual Trouble Lights, Checking Shield Cup Shutdown System

Page 22

4-2. Trouble Lights

Difficulty establishing pilot arc may indicate consumables need to be cleaned or replaced.

1

2

3

1 Pressure Light

Lights if gas/air pressure is below 40 PSI (276 kPa).

Turn power Off, and check for prop- er gas/air pressure (see Section 3-2).

2 Cup Light

Lights if shield cup is loose.

Turn power Off, and check shield cup connection (see torch Owner’s Manual). Power must be reset whenever the cup shutdown is activated.

Check shield cup shutdown system once a week (see Section 4-3).

3 Temperature Light

Lights if power source overheats (see Section 2-3).

4-3. Checking Shield Cup Shutdown System

. Power must be reset whenever the cup shutdown

system is activated. Always turn Off power when changing or checking consumables.

1

1 Torch Shield Cup

Turn Power On and loosen shield cup. If shutdown system works properly, Ready light goes off and Cup light comes on. If not, immedi- ately turn Off power and have Fac- tory Authorized Service Agent check safety control board PC1 op- eration.

If system works properly, retighten cup and reset power.

Ref. ST-801 300-A

OM-279 Page 18

Image 22
Contents Processes OM-279Description From Hobart to You Table of Contents Page Plasma Arc Cutting Hazards Symbol UsageMarks a special safety message Cutting can cause fire or explosionNoise can damage hearing Flying Sparks can cause injuryARC Rays can burn eyes and skin Fumes and Gases can be hazardousPrincipal Safety Standards EMF Information About PacemakersUNE DÉ Charge É Lectrique peut entraîner la mort Signification des symbolesLE Coupage pré sente un risque de feu ou d’explosion Identifie un message de sé curité particulierLE Plasma D’ARC peut entraîner des blessures LE Bruit peut endommager l’ouïeLES Fumé ES ET LES GAZ peuvent ê tre dangereux LES Bouteilles peuvent exploser si elles sont endommagé esPrincipales normes de sé curité Information sur les champs é lectromagné tiques Consignes relatives aux stimulateurs cardiaquesDimensions And Weight SpecificationsDuty Cycle And Overheating Selecting a Location Special installation may beCutting Speed Movement Location And AirflowInstalling And Connecting Work Clamp Connecting Gas/Air SupplyElectrical Service Guide Placing Jumper Links Always connect Connecting Input PowerThree-Phase System Grounding conductor firstOperation Front Panel ControlsSetting Gas/Air Pressure Set pressure to 70 PSI 483 kPaExample Of Cutting Operation Sequence Of OperationTrigger is pressed Maintenance & Troubleshooting Trouble Lights Checking Shield Cup Shutdown SystemTroubleshooting Running slowlyFan motor FM does not run Power light Electrical Diagrams Circuit Diagram For 230/460/575 Volt Models OM-279 Parts List Dia Part Mkgs Description Quantity Dia Part OM-279 OM-279 Page Page Service SupportContact your Distributor for Hobart Welding Products