G-Converter Chassis
| Contents |
|
Introduction | 7 | |
| Overview | 7 |
| Manager Card | 8 |
| Manager Card LED Indication | 9 |
| Removal of Manager Card | 9 |
| Power Supplies | 9 |
Installation | 10 | |
| Environmental Considerations | 10 |
| Card Cage System | 10 |
| Manager Card | 10 |
| Power Supplies | 10 |
| Channel Cards | 10 |
Management – Overview | 11 | |
Supervisor Port (terminal management) | 12 | |
| Supervisor Terminal Requirements | 12 |
| Supervisor Terminal Emulation | 12 |
| General | 13 |
| General Keyboard Conventions | 14 |
| Cursor Movement | 14 |
| Parameter Changing | 14 |
| Accepting all changes and Updating the Configuration | 14 |
| Abandoning Changes | 15 |
| Changing the Configuration Page | 15 |
| Restoring the Factory Default Configuration | 15 |
10 | 16 | |
| System Name | 16 |
| Location | 16 |
| IP Address | 16 |
| Subnet Mask | 16 |
| Gateway | 16 |
| Supervisor Terminal Requirements | 17 |
| Supervisor Terminal Emulation | 17 |
| General | 18 |
| General Keyboard Conventions | 19 |
| Cursor Movement | 19 |
| Parameter Changing | 19 |
| Accepting all changes and Updating the Configuration | 19 |
| Abandoning Changes | 20 |
| Changing the Configuration Page | 20 |
| Restoring the Factory Default Configuration | 20 |
| Telnet Screen | 20 |
4 | SALES: 0118 965 5100 |
|