Grizzly G0709 owner manual Spider Spindle Speed, Determining Spindle Speed

Page 43

Spider

 

Spindle Speed

 

 

 

Ndjg aVi]Z ^h Zfj^eeZY l^i] V hZi d[ djiWdVgY he^cYaZ hjeedgih `cdlc Vh V he^YZg! h]dlc ^c Figure 46#

He^YZg

Figure 46. He^YZgVhhZbWanadXViZYdci]Zdji"

WdVgYhe^cYaZ#

JhZ i]Z he^YZg l]Zc V adc\ ldg`e^ZXZ ]Vh i]Z ediZci^Va id ldWWaZ dg k^WgViZ l]Zc ^i ZmiZcYh i]gdj\]i]ZdjiWdVgYh^YZd[i]Zhe^cYaZ#

I]Z i^eh d[ i]Z he^YZg hXgZlh ]VkZ WgVhh lZVg eVYh i]Vi ]daY i]Z ldg`e^ZXZ l^i]dji XVjh^c\ ^cYZcihdgbVgg^c\#

L]Zci]Zhe^YZghXgZlhVgZ^chiVaaZY!VcYgZ\VgY" aZhh ^[ i]Zn VgZ jhZY id ]daY V ldg`e^ZXZ dg cdi! ValVnh adX` ZVX] he^YZg hXgZl ^c eaVXZ Wn i^\]i" Zc^c\ i]Z _Vb cjih# >[ V ldg`e^ZXZ ^h ^chiVaaZY! bZgZan i^\]iZc^c\ i]Z he^YZg hXgZlh V\V^chi i]Z ldg`e^ZXZ VcY aZVk^c\ i]Z _Vb cjih addhZ ^h cdi hV[Z# He^YZghXgZlhi]ViaddhZc Yjg^c\deZgVi^dc XVcXgVh]^cidi]ZaVi]ZZcYXdkZg#

To avoid creating an entanglement hazard, remove the spider screws when not in use, and always disconnect the lathe from power when installing, removing, or adjusting the spider screws. Ignoring this warning can lead to personal injury or machine damage.

BdYZa<%,%.B[\#H^cXZ*$&&

Jh^c\ i]Z XdggZXi he^cYaZ heZZY ^h ^bedgiVci [dg hV[ZVcYhVi^h[VXidgngZhjaih!VhlZaaVhbVm^b^o" ^c\iddaa^[Z#

Id hZi i]Z he^cYaZ heZZY [dg ndjg deZgVi^dc! ndj l^aacZZYid/&9ZiZgb^cZi]ZWZhihe^cYaZheZZY [dg i]Z Xjii^c\ iVh`! VcY ' Xdc[^\jgZ i]Z aVi]Z XdcigdahidegdYjXZi]ZgZfj^gZYhe^cYaZheZZY#

Determining Spindle Speed

BVcnkVg^VWaZhV[[ZXii]Zdei^bjbhe^cYaZheZZY idjhZ[dgVcn\^kZcdeZgVi^dch!Wjii]Zildbdhi ^bedgiVci VgZ i]Z gZXdbbZcYZY Xjii^c\ heZZY [dg i]Z ldg`e^ZXZ bViZg^Va VcY i]Z Y^VbZiZg d[ i]Zldg`e^ZXZ!VhcdiZY^ci]Z[dgbjaVh]dlc^c Figure 47#

GZXdbbZcYZY

8jii^c\HeZZY;EBm&' He^cYaZ 2 HeZZY

9^V#d[8ji^c^cX]Zhm(#&) GEB

9djWaZ^[jh^c\XVgW^YZXjii^c\idda

Figure 47.He^cYaZheZZY[dgbjaV[dgaVi]Zh#

8jii^c\heZZY!ine^XVaanYZ[^cZY^c[ZZieZgb^cjiZ ;EB! ^h i]Z heZZY Vi l]^X] i]Z ZY\Z d[ V idda bdkZhVXgdhhi]ZbViZg^Vahjg[VXZ#

6gZXdbbZcYZYXjii^c\heZZY^hVc^YZVaheZZY [dgXjii^c\VineZd[bViZg^Va^cdgYZgidegdYjXZ i]ZYZh^gZY[^c^h]VcYdei^b^oZiddaa^[Z#

I]Z Wdd`h Machinery’s Handbook dg Machine Shop Practice! VcY hdbZ ^ciZgcZi h^iZh! egd" k^YZZmXZaaZcigZXdbbZcYVi^dch[dgl]^X]Xjii^c\ heZZYhidjhZl]ZcXVaXjaVi^c\i]Zhe^cYaZheZZY# I]ZhZhdjgXZhVahdegdk^YZVlZVai]d[VYY^i^dcVa ^c[dgbVi^dcVWdjii]ZkVg^VWaZhi]ViV[[ZXiXjii^c\ heZZYVcYi]ZnVgZV\ddYZYjXVi^dcVagZhdjgXZ#

6ahd! i]ZgZ VgZ V aVg\Z cjbWZg d[ ZVhn"id"jhZ he^cYaZ heZZY XVaXjaVidgh i]Vi XVc WZ [djcY dc i]Z ^ciZgcZi# 6aa d[ i]ZhZ hdjgXZh l^aa ]Zae ndj iV`Z ^cid VXXdjci Vaa i]Z Veea^XVWaZ kVg^VWaZh ^c dgYZgidYZiZgb^cZi]ZWZhihe^cYaZheZZY[dgi]Z deZgVi^dc#

")&"

Image 43
Contents Model G0709 Ss ,EAD from Leadbased PAINTS Table of Contents Manual Accuracy Contact Info IntroductionMachine Description ZZY IdentificationMachine Data Sheet IVahidX`cd ZVijgZh Safety BdYZa%,%.B\#HcXZ*$&& Additional Safety for Metal Lathes Full-Load Current Rating Power SupplyAvailability Circuit Requirements for50 ft Grounding InstructionsExtension Cords Minimum Gauge Size 14 AWGDescription Qty SetupItems Needed for Setup UnpackingToolbox Inventory Components Qty InventoryMounted Inventory Components Qty Loose Inventory Components QtyHardware Recognition Chart Space Allocation Weight Load Physical EnvironmentElectrical Installation Site ConsiderationsBefore cleaning, gather the following ™ 9hedhVWaZGV\h CleanupBasic steps for removing rust preventative Lifting & Moving Additional Cleaning TipsBolting to Concrete Floors Using Machine MountsMounting Check Gearbox OilTo begin the test run Power ConnectionAdding Cutting Fluid Test RunZZY Page Spindle Break-In Recommended AdjustmentsFactory adjustments that should be verified Chuck and Faceplate Removal/Installation Page 27Operation Overview OperationHeadstock Controls ControlsSpindle ON/OFF Lever Apron ControlsBrake TailstockChuck & Faceplate Removal Chuck & Faceplate Removal/InstallationchiVaac\VcYgZbdkc\VineXVa Chuck & Faceplate InstallationCamlock Stud Installation Reversing Jaw Positions & Clamping a Workpiece Three-Jaw ChuckTo use the 3-jaw chuck To use the 4-jaw chuck Four-Jaw ChuckYES FaceplateSolid Dead Center CentersTo use the faceplate Live Center Installing Center in TailstockInstalling Center in Spindle Carbide-Tipped Dead CenterTailstock Lock Lever Offsetting TailstockTailstock Quill Lock LeverTo align the tailstock Aligning TailstockDrilling with Ways after each adjustmentDo not forget to lock the tailstock to To remove a tapered drill or chuck To install a tanged drill or chuckTo use the cutting fluid system Selecting and Using RestsCutting Fluid System Steady Rest Follow RestTool Post To install the restsTo load a tool holder Determining Spindle Speed Spider Spindle SpeedTo change the spindle speed Changing Spindle SpeedCross Slide Handwheel Power FeedManual Feed Carriage HandwheelTo set up for a power feed operation Feed SettingsTo set up for threading Thread SettingsFeed Selection Lever Feed Direction LeverFBSW6!VhhdlccFigure Half-Nut Lever Thread ChartThread Dial Scale ALL T10118-Tailstock Digital Readout AccessoriesG0688-Tool Post Grinder H6095-Digital Readout DROH5786-MT#3 Long Nose Precision Center H9240-Water Soluble Machining OilG1070-MT3 Live Center Set FjX`XVc\ZiddadaYZgh# Quick Change Tool Holders=*++=HHgdjcY8ZciZg9gaah# Unpainted Cast Iron MaintenanceCleaning ScheduleVc\Z\ZVgWVaadaZgh# Ball Oiler LubricationIVahidX` WVaa daZgh# Checking & Adding Oil Oil ReservoirsTo add oil to the reservoirs To change the oil in the reservoirs Belt TensionChanging Oil Tools Needed QtyTo check the cutting fluid system Cleaning Cutting fluid SystemChecking Cutting fluid System Tools NeededQtyTroubleshooting ServiceMotor & Gearbox Operation and Work Results To adjust the cross slide gib Gib AdjustmentsCross Slide Gib Compound Slide Gib To adjust the saddle slide gibSaddle Gib To adjust the cross slide backlash Backlash AdjustmentLeadscrew Endplay Adjustment Half Nut AdjustmentTo replace the shear pin Shear PinTo adjust the feed rod clutch Feed Clutch AdjustmentTo adjust the preload To adjust the tailstock lock leverTailstock Lock Bearing Preload Page To confirm that the bearings are correctly pre- loaded To remove the gap Belt ReplacementGap Insert Removal Installation To replace the V-belts on the latheTo reinstall the gap To check/replace the brake linings Brake Shoes115 Machine Storage Wiring Safety Instructions WiringWIRE/COMPONENT DAMAGE.  9VbV\ZY  lgZh  Worklamp Mainmotor Brakeswitch BdYZa%,%.B\#HcXZ*$&& Electrical Box WiringSwitches and Pump Motor Connection Spindle Motor 110V & 220V ConnectionElectrical Box Photo Headstock Case and Shift PartsDescription Headstock Parts ListHeadstock Drive Headstock Drive Parts List Headstock Spindle Headstock Spindle Parts List Change Gears Quick Quick Change Gearbox Drive Parts List Quick Change Gearbox Shift Quick Change Gearbox Shift Parts List Apron Description Apron Parts ListCross Slide Cross Slide Parts List Compound Slide Rests Tailstock Tailstock Parts List Pump Motor and Feed Rod Motor and Feed Rod Parts List Cabinet and Brake Cabinet and Brake Parts List Transformer Wuxi JBK5-100VATH Main Electrical BreakdownAccessories Labels Breakdown 10. 8dbbZcih Warranty Card$5342!, .# 0/ /8  %,,.!- 7!  22!.49 !.$ 2%452.3 Order