Grizzly G0709 owner manual Oil Reservoirs, Checking & Adding Oil, To add oil to the reservoirs

Page 58

Oil Reservoirs

Checking & Adding Oil

I]Z]ZVYhidX`!\ZVgWdm!VcYVegdc]VkZd^agZh" Zgkd^gh i]Vi VgZ Zfj^eeZY l^i] h^\]i \aVhhZh [dg fj^X`anX]ZX`^c\d^aaZkZah#7Z[dgZVcYV[iZgZkZgn jhZ! bV`Z hjgZ i]Vi i]Z d^a aZkZah VgZ XdggZXi# H]dlc ^c Figures 8991 VgZ i]Z \ZVgWdm adXV" i^dch d[ i]Z h^\]i \aVhhZh VcY i]Z [^aa VcY YgV^c eaj\h#

To add oil to the reservoirs:

1. 8aZVc i]Z VgZV VgdjcY i]Z [^aa eaj\ XaZVc id

egZkZci YZWg^h [gdb [Vaa^c\ ^c i]Z gZhZgkd^g

l]ZcVYY^c\d^a#

 

2. GZbdkZi]Z[^aaeaj\#

 

3. HadlanVYYd^ajci^ai]Zd^aaZkZa^hXZciZgZY^c

i]Zh^\]i\aVhh#

 

4. GZeaVXZ[^aaeaj\#

 

=ZVYhidX`;^aaEaj\

 

 

 

6egdc

 

 

;^aa

 

 

Eaj\

<ZVgWdm

=ZVYhidX`

6egdc

H^\]i<aVhh H^\]i<aVhh H^\]i<aVhh

Figure 89. AdXVi^dcd[d^ah^\]i\aVhhZhVcY

 

ZmiZg^dg[^aaeaj\h#

 

"*+"

 

 

=ZVYhidX` 9gV^cEaj\

<ZVgWdm ;^aaEaj\

<ZVgWdm 9gV^cEaj\

Figure 90. <ZVgWdm[^aaVcYYgV^ceaj\h#

6egdc 9gV^c Eaj\

Figure 91. 6egdcYgV^ceaj\#

BdYZa<%,%.B[\#H^cXZ*$&&

Image 58
Contents Model G0709 Ss ,EAD from Leadbased PAINTS Table of Contents Manual Accuracy Contact Info IntroductionMachine Description Identification ZZYMachine Data Sheet IVahidX`cd ZVijgZh Safety BdYZa%,%.B\#HcXZ*$&& Additional Safety for Metal Lathes Circuit Requirements for Power SupplyAvailability Full-Load Current RatingMinimum Gauge Size 14 AWG Grounding InstructionsExtension Cords 50 ftUnpacking SetupItems Needed for Setup Description QtyLoose Inventory Components Qty InventoryMounted Inventory Components Qty Toolbox Inventory Components QtyHardware Recognition Chart Site Considerations Weight Load Physical EnvironmentElectrical Installation Space AllocationBefore cleaning, gather the following ™ 9hedhVWaZGV\h CleanupBasic steps for removing rust preventative Additional Cleaning Tips Lifting & MovingCheck Gearbox Oil Using Machine MountsMounting Bolting to Concrete FloorsTest Run Power ConnectionAdding Cutting Fluid To begin the test runZZY Page Chuck and Faceplate Removal/Installation Page 27 Recommended AdjustmentsFactory adjustments that should be verified Spindle Break-InOperation Operation OverviewControls Headstock ControlsApron Controls Spindle ON/OFF LeverTailstock BrakeChuck & Faceplate Removal/Installation Chuck & Faceplate RemovalChuck & Faceplate Installation chiVaac\VcYgZbdkc\VineXVaCamlock Stud Installation Reversing Jaw Positions & Clamping a Workpiece Three-Jaw ChuckTo use the 3-jaw chuck Four-Jaw Chuck To use the 4-jaw chuckFaceplate YESSolid Dead Center CentersTo use the faceplate Carbide-Tipped Dead Center Installing Center in TailstockInstalling Center in Spindle Live CenterQuill Lock Lever Offsetting TailstockTailstock Tailstock Lock LeverAligning Tailstock To align the tailstockDrilling with Ways after each adjustmentDo not forget to lock the tailstock to To install a tanged drill or chuck To remove a tapered drill or chuckSteady Rest Follow Rest Selecting and Using RestsCutting Fluid System To use the cutting fluid systemTool Post To install the restsTo load a tool holder Spider Spindle Speed Determining Spindle SpeedChanging Spindle Speed To change the spindle speedCarriage Handwheel Power FeedManual Feed Cross Slide HandwheelFeed Settings To set up for a power feed operationThread Settings To set up for threadingFeed Selection Lever Feed Direction LeverFBSW6!VhhdlccFigure Half-Nut Lever Thread ChartThread Dial Scale ALL H6095-Digital Readout DRO AccessoriesG0688-Tool Post Grinder T10118-Tailstock Digital ReadoutH5786-MT#3 Long Nose Precision Center H9240-Water Soluble Machining OilG1070-MT3 Live Center Set Quick Change Tool Holders FjX`XVc\ZiddadaYZgh#=*++=HHgdjcY8ZciZg9gaah# Schedule MaintenanceCleaning Unpainted Cast IronBall Oiler Lubrication Vc\Z\ZVgWVaadaZgh#IVahidX` WVaa daZgh# Checking & Adding Oil Oil ReservoirsTo add oil to the reservoirs Tools Needed Qty Belt TensionChanging Oil To change the oil in the reservoirsTools NeededQty Cleaning Cutting fluid SystemChecking Cutting fluid System To check the cutting fluid systemTroubleshooting ServiceMotor & Gearbox Operation and Work Results To adjust the cross slide gib Gib AdjustmentsCross Slide Gib Compound Slide Gib To adjust the saddle slide gibSaddle Gib Backlash Adjustment To adjust the cross slide backlashHalf Nut Adjustment Leadscrew Endplay AdjustmentShear Pin To replace the shear pinFeed Clutch Adjustment To adjust the feed rod clutchTo adjust the preload To adjust the tailstock lock leverTailstock Lock Bearing Preload Page To confirm that the bearings are correctly pre- loaded To replace the V-belts on the lathe Belt ReplacementGap Insert Removal Installation To remove the gapTo reinstall the gap To check/replace the brake linings Brake Shoes115 Machine Storage Wiring Safety Instructions WiringWIRE/COMPONENT DAMAGE.  9VbV\ZY  lgZh  Worklamp Mainmotor Brakeswitch Electrical Box Wiring BdYZa%,%.B\#HcXZ*$&&Switches and Pump Motor Spindle Motor 110V & 220V Connection ConnectionElectrical Box Photo Parts Headstock Case and ShiftHeadstock Parts List DescriptionHeadstock Drive Headstock Drive Parts List Headstock Spindle Headstock Spindle Parts List Change Gears Quick Quick Change Gearbox Drive Parts List Quick Change Gearbox Shift Quick Change Gearbox Shift Parts List Apron Apron Parts List DescriptionCross Slide Cross Slide Parts List Compound Slide Rests Tailstock Tailstock Parts List Pump Motor and Feed Rod Motor and Feed Rod Parts List Cabinet and Brake Cabinet and Brake Parts List Main Electrical Breakdown Transformer Wuxi JBK5-100VATHAccessories Labels Breakdown Warranty Card 10. 8dbbZcih$5342!, .# 0/ /8  %,,.!- 7!  22!.49 !.$ 2%452.3 Order