Grizzly G0709 owner manual Changing Spindle Speed, To change the spindle speed

Page 44

Changing Spindle Speed

I]^h aVi]Z ^h Zfj^eeZY l^i] ild aZkZgh h]dlc ^c Figure 48 i]ViVgZjhZYidVX]^ZkZZ^\]ihe^cYaZ heZZYh# Never move either lever while the spindle is rotating, or gear clash and tooth fracture may occur.L]Zci]ZaVi]Z^hhideeZY! ^[i]ZaZkZghYdcdi[jaanZc\V\Z!i]Zhe^cYaZbjhi WZha^\]iangdiViZYWn]VcY#

GVc\ZAZkZg

HZaZXi^c\

==^\]

HeZZYAZkZg

HZaZXi^c\

&'%%GEB

Figure 48.He^cYaZheZZYaZkZgh#

>[i]Zhe^cYaZheZZYgVc\ZaZkZghZZFigure 48^h edh^i^dcZY^cadlA!i]Z[djghe^cYaZheZZYha^hi" ZY^ci]ZWaVX`^cY^XVidgVgZVkV^aVWaZ#>[i]ZgVc\Z aZkZg ^h edh^i^dcZY ^c ]^\] =! i]Z [djg he^cYaZ heZZYha^hiZY^ci]ZgZY^cY^XVidgVgZVkV^aVWaZ#

I]Zhe^cYaZheZZYaZkZgh]dlc^cFigure 48]Vh Z^\]iheZZYhZaZXi^dchYZeZcY^c\dc^[i]Zhe^cYaZ heZZYgVc\ZaZkZg^h^c]^\]dgadl#

L]Zc^cadlgVc\Z!i]ZVkV^aVWaZhe^cYaZheZZYh VgZ ,%! &&*! &.%! VcY (%%! VcY l]Zc ^c ]^\] gVc\Z! i]Z VkV^aVWaZ heZZYh VgZ )+%! ,**! &'**! VcY'%%%#

")'"

To change the spindle speed:

1. 9ZiZgb^cZi]Zhe^cYaZheZZYgZfj^gZY[dgi]Z aVi]ZdeZgVi^dc#

2. BdkZ i]Z he^cYaZ heZZY gVc\Z aZkZg id i]Z g^\]i[dg]^\]gVc\ZdgaZ[i[dgadlgVc\Z#

3. BdkZi]Zhe^cYaZheZZYaZkZgidi]ZaZ[ihd^i

^hdkZgi]ZgZfj^gZYheZZY![dgZmVbeaZ&'%%

GEB^hWZ^c\hZaZXiZY^cFigure 48#

L]Zci]ZgVc\ZaZkZg^h^c]^\]!i]ZheZZYh ^ci]ZgZYWVcYVgZVkV^aVWaZ#

L]Zci]ZgVc\ZaZkZg^h^cadl!i]ZheZZYh ^ci]ZWaVX`WVcYVgZVkV^aVWaZ#

BdYZa<%,%.B[\#H^cXZ*$&&

Image 44
Contents Model G0709 Ss ,EAD from Leadbased PAINTS Table of Contents Machine Description IntroductionManual Accuracy Contact Info Identification ZZYMachine Data Sheet IVahidX`cd ZVijgZh Safety BdYZa%,%.B\#HcXZ*$&& Additional Safety for Metal Lathes Power Supply AvailabilityCircuit Requirements for Full-Load Current RatingGrounding Instructions Extension CordsMinimum Gauge Size 14 AWG 50 ftSetup Items Needed for SetupUnpacking Description QtyInventory Mounted Inventory Components QtyLoose Inventory Components Qty Toolbox Inventory Components QtyHardware Recognition Chart Weight Load Physical Environment Electrical InstallationSite Considerations Space AllocationBasic steps for removing rust preventative CleanupBefore cleaning, gather the following ™ 9hedhVWaZGV\h Additional Cleaning Tips Lifting & MovingUsing Machine Mounts MountingCheck Gearbox Oil Bolting to Concrete FloorsPower Connection Adding Cutting FluidTest Run To begin the test runZZY Page Recommended Adjustments Factory adjustments that should be verifiedChuck and Faceplate Removal/Installation Page 27 Spindle Break-InOperation Operation OverviewControls Headstock ControlsApron Controls Spindle ON/OFF LeverTailstock BrakeChuck & Faceplate Removal/Installation Chuck & Faceplate RemovalChuck & Faceplate Installation chiVaac\VcYgZbdkc\VineXVaCamlock Stud Installation To use the 3-jaw chuck Three-Jaw ChuckReversing Jaw Positions & Clamping a Workpiece Four-Jaw Chuck To use the 4-jaw chuckFaceplate YESTo use the faceplate CentersSolid Dead Center Installing Center in Tailstock Installing Center in SpindleCarbide-Tipped Dead Center Live CenterOffsetting Tailstock TailstockQuill Lock Lever Tailstock Lock LeverAligning Tailstock To align the tailstockDo not forget to lock the tailstock to Ways after each adjustmentDrilling with To install a tanged drill or chuck To remove a tapered drill or chuckSelecting and Using Rests Cutting Fluid SystemSteady Rest Follow Rest To use the cutting fluid systemTo load a tool holder To install the restsTool Post Spider Spindle Speed Determining Spindle SpeedChanging Spindle Speed To change the spindle speedPower Feed Manual FeedCarriage Handwheel Cross Slide HandwheelFeed Settings To set up for a power feed operationThread Settings To set up for threadingFBSW6!VhhdlccFigure Feed Direction LeverFeed Selection Lever Thread Dial Thread ChartHalf-Nut Lever Scale ALL Accessories G0688-Tool Post GrinderH6095-Digital Readout DRO T10118-Tailstock Digital ReadoutG1070-MT3 Live Center Set H9240-Water Soluble Machining OilH5786-MT#3 Long Nose Precision Center Quick Change Tool Holders FjX`XVc\ZiddadaYZgh#=*++=HHgdjcY8ZciZg9gaah# Maintenance CleaningSchedule Unpainted Cast IronBall Oiler Lubrication Vc\Z\ZVgWVaadaZgh#IVahidX` WVaa daZgh# To add oil to the reservoirs Oil ReservoirsChecking & Adding Oil Belt Tension Changing OilTools Needed Qty To change the oil in the reservoirsCleaning Cutting fluid System Checking Cutting fluid SystemTools NeededQty To check the cutting fluid systemMotor & Gearbox ServiceTroubleshooting Operation and Work Results Cross Slide Gib Gib AdjustmentsTo adjust the cross slide gib Saddle Gib To adjust the saddle slide gibCompound Slide Gib Backlash Adjustment To adjust the cross slide backlashHalf Nut Adjustment Leadscrew Endplay AdjustmentShear Pin To replace the shear pinFeed Clutch Adjustment To adjust the feed rod clutchTailstock Lock Bearing Preload To adjust the tailstock lock leverTo adjust the preload Page To confirm that the bearings are correctly pre- loaded Belt Replacement Gap Insert Removal InstallationTo replace the V-belts on the lathe To remove the gapTo reinstall the gap 115 Brake ShoesTo check/replace the brake linings Machine Storage WIRE/COMPONENT DAMAGE.  9VbV\ZY  lgZh  WiringWiring Safety Instructions Worklamp Mainmotor Brakeswitch Electrical Box Wiring BdYZa%,%.B\#HcXZ*$&&Switches and Pump Motor Spindle Motor 110V & 220V Connection ConnectionElectrical Box Photo Parts Headstock Case and ShiftHeadstock Parts List DescriptionHeadstock Drive Headstock Drive Parts List Headstock Spindle Headstock Spindle Parts List Change Gears Quick Quick Change Gearbox Drive Parts List Quick Change Gearbox Shift Quick Change Gearbox Shift Parts List Apron Apron Parts List DescriptionCross Slide Cross Slide Parts List Compound Slide Rests Tailstock Tailstock Parts List Pump Motor and Feed Rod Motor and Feed Rod Parts List Cabinet and Brake Cabinet and Brake Parts List Main Electrical Breakdown Transformer Wuxi JBK5-100VATHAccessories Labels Breakdown Warranty Card 10. 8dbbZcih$5342!, .# 0/ /8  %,,.!- 7!  22!.49 !.$ 2%452.3 Order