NOTE: Avoid contact between tubing and structure
OUTDOOR WALL INDOOR WALL
CAULK
LIQUID TUBE
VAPOR TUBE
INSULATION
THROUGH THE WALL
JOIST
HANGER STRAP
(AROUND VAPOR
TUBE ONLY)INSULATION VAPOR TUBE
1″ MIN.
LIQUID TUBE
SUSPENSION
A01383
Fig. 2—Connecting Tubing Installation
INSPECT EQUIPMENT
File claim with shipping company prior to installation if shipment is damaged or incomplete.
Step 2—Install on a Solid, Level Mounting Pad
If conditions or local codes require the unit be attached to pad, tie down bolts should be used and fastened through knockouts provided in unit base pan. Refer to unit mounting pattern in Fig. 3 to determine base pan size and knockout hole location.
On rooftop applications, mount on level platform or frame. Place unit above a load bearing wall and isolate unit and tubing set from structure. Arrange supporting members to adequately support unit and minimize transmission of vibration to building. Consult local codes governing rooftop applications.
Do not allow POE lubricant to come into contact with roofing material. POE may deteriorate certain types of synthetic roofing.
NOTE: Unit must be level to within ±2° (±3/8 in./ft).
Step 3—Clearance Requirements
When installing, allow sufficient space for airflow clearance, wiring, refrigerant piping, and service. Allow
Step 4—Operating Ambient
The minimum outdoor operating ambient in cooling mode is 55°F, and the maximum outdoor operating ambient in cooling mode is 125°F.
→Step 5—Install TXV
Puron® fan coils and furnace coils come factory equipped with a
TXV must be replaced with a factory approved TXV specifi- cally designed for Puron®
NOTE: FK4, FC4, and 40FK fan coils are equipped with an
(2) PLACES
A
CL
B
| VIEW FROM TOP |
|
|
|
| 8 3/16 ″ |
|
|
|
|
| ||
|
|
|
|
| ||
|
|
|
|
| A97548 | |
|
|
|
|
|
| |
| Dimensions (In.) |
|
| |||
|
|
|
|
|
|
|
| MINIMUM MOUNTING | TIEDOWN KNOCKOUT | ||||
UNIT SIZE |
| LOCATIONS | ||||
PAD DIMENSIONS |
| |||||
|
| A |
| B | ||
|
|
|
| |||
|
|
|
|
|
|
|
024 | 19 X 24 |
| ||||
26 X 32 | 4 |
| ||||
|
|
|
|
|
|
|
Fig. 3—Mounting Unit to Pad
conditioner, the
→If indoor unit is equipped with piston, remove indoor coil piston and replace with balance port hard shutoff TXV metering device.
→IMPORTANT: The 38TDB037 unit includes a factory supplied TXV kit. All other sizes do not include factory supplied TXV kit.
TXV INSTALLATION
IMPORTANT: The TXV should be mounted as close to the indoor coil as possible and in a vertical, upright position. Avoid mounting the inlet tube vertically down. A factory supplied or approved filter drier must be installed in the liquid line.
Installing TXV in Place of Piston
→1. Remove any existing refrigerant and ensure coil has not been exposed to atmospheric pressure for more than 15 minutes.
2.Remove indoor coil inlet tube at piston body inlet. Use
3.Remove piston retainer, begin careful not to damage scaling surface of
4.Remove and discard
5.Reinstall piston retainer in piston body.
6.Replace indoor coil inlet tube. Use
To prevent damage to the unit, use a brazing shield and wrap TXV with wet cloth.
7.Sweat swivel adapter (see Fig. 5D) to inlet of indoor coil and attach to TXV (see Fig. 5A) outlet. Use backup wrench to avoid damage to tubing or valve. Sweat Inlet of TXV, marked “IN” to liquid line. Avoid excessive heat which could damage valve
2