Carrier 06D specifications Capacity Control Valve Operation

Page 11

Fig. 8 — Capacity Control Valve Operation

FILL CONDENSER WITH

CLEANING SOLUTION. DO

NOT ADD SOLUTION

MORE RAPIDLY THAN

VENT CAN EXHAUST

GASES CAUSED BY

CHEMICAL ACTION.

1”

PIPE

VENT

PIPE

5’ APPROX

3’ TO 4’

CENTRIFUGAL PUMP 1/2 HP

GAS VENT

CLOSE VENT PIPE

30 GPM AT 35’ HEAD

 

VALVE WHEN

 

PRIMING

GLOBE

PUMP IS

PUMP

CONN.

RUNNING

 

 

VALVES

 

SUCTION

 

 

 

PUMP

SUPPORT

1” PIPE

CONDENSER

TANK LEGEND

CONDENSER

REMOVE WATER

Fig. 9 — Gravity Circulation

1Oil Pressure Relief Valve 5 — EccentricREGULATINGShaft VALVE

2 — Piston and Eccentric

6 — Eccentric Strap Side

Strap Assembly

Shield

3Motor End Counterweight 7 — Oil Suction Tube

FINE MESHRETURN

4Oil Return Check Valve 8 — Pump End Counterweight

SCREEN

Fig. 11 — Compressor

Fig. 10 — Forced Circulation

(Bottom Plate Removed)

11

Image 11
Contents Installation ContentsBefore Installation Safety ConsiderationsB212 Unit 07D Width aA203 B205 A208 B21006D Compressor Unit Dimensions Electrical Connections LLS EquipGND HPSCrankcase Heater Overload Relay Control Relay Ground Connection SwitchLow-Pressure Switch Timer Relay Recommended Field Wiring Checking Operation Refrigerant ChargingInitial START-UP Closed Switch Type Switch PositionPressure Change Affecting Capacity Control Pressure Fig Condenser MaintenanceCapacity Control Valve Operation Range Usage PER ServiceService Notes Size Threads TorquePhase Barrier Positioning KEY see FIG Removing Pump End Bearing Head Pump END Compressor Part Compressor Model MAX* AllowWear Motor ENDCompressor Running Gear Removal Cleaning Suction StrainerCompressor Motor Burnout Compressor Running Gear ReplacementProblem Cause Remedy TroubleshootingHot liquid line System noisesCompressor loses oil Frosted suction lineCopyright 2002 Carrier Corporation