Grizzly G0463 owner manual Feet, Mounting to Workbench, Components and Hardware Needed Qty

Page 16

Feet

 

Four leveling feet have been included with your

mill/drill. However, we recommend bolting your

machine to a sturdy workbench.

 

Components and Hardware Needed:

Qty

Feet with Hex Nut M12-1.75

4

To install the feet on the mill/drill:

 

1.With the help of an assistant, tip the mill/drill back to gain access to the underside of the base and thread the feet into the threaded holes.

2.Place your precision level on the mill/drill table.

3.Adjust the hex nut(s) until the mill/drill is level side-to-side and front-to-back as shown in

Figure 6.

Hex Nut

Figure 6. Leveling the mill/drill.

-14-

Mounting to

 

Workbench

 

The Model G0463 should be bolted to a work-

bench to provide maximum rigidity and safety.

Components and Hardware Needed:

Qty

Hex Bolts M12-1.75 x (length as needed)

4

Flat Washers 12mm

8

Lock Washers 12mm

4

Hex Nuts M12-1.75

4

To mount the mill/drill to the workbench:

 

1.Determine the best position for the mill/drill on the workbench.

Note: For the best performance, make sure the cross feed and the longitudinal handwheels extend out beyond the edge of the table surface. This will allow unrestricted handwheel operation.

2.Mark your hole locations using the mounting holes in the base as a guide.

3.Drill the holes needed in the workbench.

4.Place a precision level on the mill/drill table and shim the mill/drill until it is level side-to- side and front-to-back.

5.Bolt the mill/drill to the workbench.

G0463 Small Mill/Drill

Image 16
Contents Model G0463 Small MILL/DRILL Page Table of Contents Accessories Maintenance Foreword IntroductionContact Info Product Dimensions Shipping DimensionsElectrical MotorMain Specifications FeaturesTable Info ConstructionIdentification Safety Safety Instructions for MachineryAlways Lock Mobile Bases if Used Before Operating Machinery Additional Safety for Mill/Drills Circuit Requirements 110V OperationSET UP Set Up SafetyItems Needed for Set Up UnpackingBox 1 Figures 3 Qty InventoryItems not shown Clean Up Site ConsiderationsTo install the feet on the mill/drill FeetMounting to Workbench Components and Hardware Needed QtyTo begin the start up and break-in procedure Test Run Spindle Break-inTools Needed Qty Drill Chuck RemovalTo remove the chuck and arbor from the spindle Collets To install the R-8 colletTo remove the collet Power Controls Operation SafetyOperations Power Shutdown To completely shut the system power OFFSpindle & Headstock Controls To use the rapid downfeedLongitudinal Feed Table TravelCross Feed Setting RPM To determine the needed RPMCutting Speed x 4 /Tool Diameter = RPM Cutting Speeds for High Speed Steel HSS Cutting ToolsAccessories G9324-Boring Head Combo Set G2861-21⁄2 Face MillH2689-R-8 Quick Change Collet Set H5685-4Rotary TableMaintenance ScheduleUnpainted Cast Iron LubricationAbout Service ServiceTroubleshooting Adjusting Gibs To adjust the gibs see FigureReplacing Motor Brushes & Fuse To replace the motor brushesElectrical Components Circuit boardWiring Diagram Parts Breakdown 237 238 240 241 236 242 235 234 Parts List DescriptionPK30M Emergency Stop Switch Warranty and Returns Page Page