Grizzly G0755 owner manual Table Leadscrews, Quill Rack & Pinion

Page 35

Table Leadscrews

Oil Type.......Model T23962 or ISo 68 Equivalent

Oil Amount

Thin Coat

Lubrication Frequency

40 Hrs. of Operation

Move the table as necessary to access the entire length of the X- and Y-axis leadscrews (see Figures 49–50), then use mineral spirits, shop rags, and a brush to clean them.

Quill Rack & Pinion

Oil Type

NLGI#2 Grease or Equivalent

Oil Amount

Thin Coat

Lubrication Frequency

90 Days of Operation

Move the quill up and down to gain full access to the rack and pinion (see Figure 51), then clean the teeth with mineral spirits, shop rags, and a brush.

X-Axis Leadscrew

Figure 49. X-axis leadscrew.

Note: Use a 4mm hex wrench to remove the way cover from the column and access the Y-axis leadscrew.

Y-Axis Leadscrew

Figure 50. Y-axis leadscrew.

Use a clean brush to apply a thin coat of oil to the leadscrew threads, then move the table through the X- and Y-axis paths to distribute the oil.

Replace the way cover before connecting the machine to power.

Pinion

Rack

Figure 51. Quill rack and pinion.

Use a brush to apply a thin coat of grease to the teeth, then raise/lower the quill several times to distribute the grease.

Note: Re-apply oil to the smooth outside surface of the quill that was removed during the cleaning process.

Model G0755 (Mfg. Since 1/13)

-33-

Image 35
Contents Model G0755 Page Table of Contents Contact Info IntroductionMachine Description Manual Accuracy Identification Machine Data Sheet Table Info Safety Instructions for Machinery SafetyPage Additional Safety for Mill/Drills Circuit Requirements for Power SupplyAvailability Full-Load Current Rating50 ft Grounding InstructionsExtension Cords Minimum Gauge Size 14 AWGUnpackingInventory SetupNeeded for Setup Basic steps for removing rust preventative CleanupBefore cleaning, gather the following Site Considerations To move your machine into position Lifting & PlacingMachine Base Concrete Anchoring to Floor AssemblyAnchoring to Concrete Floors To join the drill chuck and arbor Joining Drill Chuck ArborLubricating Mill/Drill To test run the machine Test RunSpindle Break-In Inspections AdjustmentsOperation Overview OperationsIdentification Using Coarse DownfeedUsing Fine Downfeed Control Panel Downfeed ControlsRaising/Lowering Headstock Depth StopHeadstock Movement Graduated Dials Table TravelTilting Headstock Axis Handwheels Axis Power FeedON/OFF Switch Tool Needed Qty Installing/Removing ToolingInstalling Tool Holder To install tool holderTools Needed Qty Spindle SpeedRemoving Tool Holder Determining Spindle SpeedSpindle Speed Range Lever Speed Lever Setting Spindle SpeedISO 68 and ISO 32 machine oil AccessoriesH7527 6 Rotary Table Set H7527-6 Rotary Table SetH5930-4-Pc Center Drill Set H5931-4-Pc Center Drill Set G9612-Test IndicatorG5774-R-8 End Mill Holder Set G5641-1-2-3 Blocks G9815-Parallel SetLubrication MaintenanceCleaning Protecting ScheduleTo change the headstock oil Headstock ReservoirTable/Column Ways & Quill Ball OilersQuill Rack & Pinion Table LeadscrewsAxis Leadscrew Troubleshooting ServiceSymptom Possible Cause Possible Solution Adjusting Leadscrew Backlash Adjusting GibsTo tram the spindle with the table Tramming SpindleReplacing Power Feed Carbon Brushes Tightening Return Spring Tension To adjust the return spring tensionWiring Safety Instructions WiringControl Panel Electrical Box WiringMotors & Other Electrical Wiring Electrical Box Axis Motor Axis Limit SwitchElectrical Photos Spindle Motor Control Panel Rear ViewHead PartsDescription Head Parts ListDescription Table & Column Table & Column Parts List 401 406 402 403 405 404 415 411 408 407 409 412 410 413 414 Electrical ComponentsPower Feed Accessories Machine Labels & Cosmetics Comments Warranty CardBOX BELLINGHAM, WA Grizzly INDUSTRIAL, INCWarranty & Returns