Elation Professional 12 Brick II manual Mounting, Below

Page 13

Design LED 12 Brick II ™

Overhead mounting requires extensive experience, including amongst others calculating working load limits, a fine knowledge of the installation material being used, and periodic safety inspection of all installation material and the fixture. If you lack these qualifications, do not attempt the installation yourself. Improper installation can result in bodily injury.

Be sure to complete all rigging and installation procedures before connecting the main power cord to the appropriate wall outlet.

Mounting

The Design LED 12 Brick II ™ is fully operational in three different mounting positions, hanging upside-down from a ceiling, side mounted, or set on a flat level surface. Be sure this fixture is kept at least 0.5m away from any flammable materials (decoration etc.). When clamp mounting; always use and install the supplied safety cable as an added safety measure to prevent accidental damage in the event of a clamp failure. See the image

below.

©Elation Professional, Los Angeles Ca.

12

www.ElationLighting.com

Image 13
Contents Design LED 12 Brick Table of Contens ContentsGeneral Information Rain or moisture Never open this fixture while in use Safety InstructionsDesign LED 12 Brick Features General Guidelines Fixture Overview Design LED 12 Brick Design LED 12 Brick Mounting points Mounting and InstallationBelow MountingDesign LED 12 Brick Securing the Design LED 12 Brick DMX-512 control connection Understanding DMXDMX-512 connection with DMX terminator ControllerUnderstanding Fixture DMX addressing Operating Modes SpecificationLED Control model Internal Strobe Dimmer/Speed:Display menu: Remark DMX Operation Notes DMX Channel Traits Channel 4 General dimming Cleaning and Maintenance Year Limited Warranty Design LED 12 Brick Photometric Data Beam angleDesign LED 12 Brick Circuit Schematic Technical Specifications Design LED 12 Brick