Trane RTUB 207-224 Pressure tests and leak detection, Equivalent pressure drops, Discharge line

Page 19

Installation

Equivalent pressure drops

To correctly determine the size of the liquid and discharge lines for connection on site, it is first necessary to establish the equivalent pressure drops for each line, comprising the additional flow resistances, from bends, valves, etc. As a first approximation, we can estimate the equivalent pressure drops at 1.5 times the piping length.

Size of the liquid line

The standpipe must not be more than 5 m above the air-cooled condenser base. It is not necessary to slope the liquid line. It is recommended to have a line diameter as small as possible, while maintaining an acceptable pressure drop so as to minimize the refrigerant charge (length and maximum pressure drops defined above).

Determine the size using the following criteria:

1.Operating conditions with full load

2.Maximum pressure drops of 100-kPa

3.Liquid speed not exceeding 3 m/s (to prevent liquid shocks)

In normal operating conditions (suction temperature 4.5°C, condenser air inlet temperature 35°C or condensation temperature of 52°C), the liquid leaving the condenser is sub-cooled by approximately 10°C.Take this value as a basis to determine the maximum permitted pressure drops, and use it to calculate the liquid line pressure drops.

Discharge line

Install them so as to obtain a gas speed in the horizontal and vertical lines making it possible to carry along the compressor oil. Determine the dimensions of the suction line using the following criteria:

1.2.5 m/s (minimum) in the horizontal parts

2.5.0 m/s (minimum) in the vertical parts

3.Maximum speed 20 m/s

The minimum slope of the suction line to the condenser must be 5%. Isolate refrigerant fluid lines from the building to prevent the vibrations normally generated by the ducts from being transmitted to the building's structure. Also avoid bypassing the unit's isolation system by fixing the refrigerant fluid lines or the electrical ducts very rigidly. Any vibrations may be propagated into the building via rigid piping or lines.

Pressure tests and leak detection

￿WARNING

During these operations, take the following precautions:

1.Do not use oxygen or acetylene instead of the refrigerant fluid and nitrogen to detect leaks.This may cause a violent explosion.

2.Always use the expansion valve, safety valves and manometers to control the test pressure in the system. Excessive pressure may cause piping to rupture, damage the unit or cause explosion resulting in personal injury.

Carry out the liquid line and hot gas line pressure tests using the standards in force.The test pressure applied to the liquid line and the discharge line must comply with local regulations. Insert enough refrigerant fluid into the circuit to obtain a pressure of 1 bar.

By injecting dry nitrogen using a pump, increase this pressure to

7 bars. Look for leaks in the entire system using a detector.

If leaks are detected, evacuate the fluid from the system and repair the defective component. Repeat the test process to check the repair is watertight.

RLC-SVX03A-E4

19

Image 19
Contents Installation Operation Maintenance Refrigerant Contents Operation General information Inspection ChecklistUnit Inspection Description of the Unit Loose Parts InventoryGeneral data Rtub General data Rtca Installation responsibilities InstallationStorage Isolation Special Lifting and Moving InstructionsFoundation Length Width Height ClearancesReleasing the Nitrogen Holding Charge DrainageWater Connections Rtub Water Pressure Gauges Flow Switch InstallationWater Treatment Water Pressure-Relief Valves Refrigerant Safety ValvesInstalling and connecting temperature sensors Extension of sensor power cableConnecting the Rtub with a remote air-cooled condenser Electrical connections performed by the installerDetail of positions of refrigerant sensors 5R56-1 and 5R6-2 Units on the same level Rtca or other manufacturers condenser below the Rtub Discharge line Pressure tests and leak detectionEquivalent pressure drops Size of the liquid lineVacuum pump connection Vacuum pumpingUnit Voltage Phasing Installation ChecklistOperation Pre-start checkoutOverheating Start-up ProceduresSystem Restart After Extended Shutdown Shutdown proceduresSubcooling Seasonal Unit Start-upOperation Maintenance For units without discharge valve option For units with the discharge valve optionChecking the separator oil level Some symptoms of a refrigerant under-charged unitSome symptoms of a refrigerant over-charged unit Some symptoms of an oil over- charged unitCharge Isolation in the high or low side of the system R134a Field-Charging ProcedureMeasuring the oil level Filter Replacement ProcedureOil Charging Procedure Lubrication SystemFactory initial Oil-Charging Procedure Field Oil-Charging ProcedureMaintenance Maintenance contract Safety recommendationsTraining