Jet Tools JWP-208 operating instructions Receiving, Installation & Assembly, Starter Box

Page 7

Receiving

Carefully unpack the planer and any loose items from the wood crate and inspect for damage. Any damage should be reported immediately to your distributor and shipping agent. Before proceeding further, read your manual thoroughly to familiarize yourself with proper assembly, maintenance and safety procedures.

Remove the screws that hold the planer to the shipping skid. Remove the protective coating from the table, bed rolls, feed rolls, cutterhead and loose items packed with the machine, including lifting handles and motor pulley. This coating may be removed with a soft cloth moistened with Kerosene. Do not use acetone, gasoline or lacquer thinner for this purpose. Do not use solvents on plastic parts.

Use care when cleaning the cutterhead, the knives are very sharp.

Installation & Assembly

1.There are four lifting handles (Fig. 3) on the machine. Pull the handles out for use, push in when not in use.

2.If a sling or forklift is used to lift the machine, be sure to lift by the handles only. See Fig. 3. Make sure machine is kept in level position while lifting.

3.For best planing performance, locate planer on a solid, level foundation and anchor to the floor with good quality lag screws. Do not tighten screws completely yet.

4.With machine in position, test table surface lengthwise and crosswise with machinist’s level. Place metal shims under low corners.

5.Check that all four corners are supported, then tighten lag screws.

6.Re-test level of table surface in both directions and adjust if necessary.

Starter Box

Mount the starter box at the left side of the machine with two socket head cap screws (Fig. 4).

Figure 3

Figure 4

7

Image 7
Contents Part No. M-708528 Vantage Drive Elgin, IllinoisRevision G1 06/06 Copyright WMH Tool Group More Information Warranty and ServiceTable of Contents Page Safety Decals Features Specifications Receiving Installation & AssemblyStarter Box Table Extension Rollers HandwheelDust Collection Hood Belt and Pulleys AdjustmentsElectrical Connections Extension CordsOverview Table RollersAdjusting Table Extension Rollers Always tighten the lock nuts before operating the planer Adjusting Depth of CutCutterhead Adjustment Knife AdjustmentReplacing & Resetting Knives Adjusting Work Table Parallel to Cutterhead Anti-Kickback Fingers Adjusting Infeed & Outfeed Roller Spring TensionKnow the Transmitting Rollers of Your Planer Page Feed Speed Control Changing Accessories for Lowest Feed SpeedReturn Rollers Lubrication MaintenancePage Possible Cause Solution TroubleshootingOperating Problems ProblemMechanical and Electrical Problems Parts Optional AccessoriesOrdering Replacement Parts Head Assembly Parts ListTS-1540041 BB-6206ZZTS-1523071 TS-1490031Description Size Qty Head Assembly Exploded View Table and Roller Parts and Assembly Stand and Motor Parts and Assembly BB-6202ZZ Base and Column Parts ListTS-1533032 Base and Column Assembly Gearbox Parts List Gearbox Assembly 230V 3HP Single Phase Wiring Diagrams230V 5HP Three Phase 460V 5HP Three Phase Page Vantage Drive Elgin, IL