SECTION 5 − OPERATION
5-1. Front Panel Controls Of Feeder (Air-Cooled Model Shown)
|
| 1 | Voltage/Wire Speed Meter | |
| 1 |
| (Optional) | |
|
| 2 | Voltage/Wire Speed Switch | |
| 2 |
| (Optional) | |
| 3 | 3 | ||
| 4 | Jog Switch | ||
|
| |||
| 4 | 5 | Burnback Time Control | |
|
|
| (Optional) | |
11 | 5 | 6 | Spot/Continuous Switch | |
|
|
| (Optional) | |
| 6 | 7 | Remote Voltage Control | |
|
| (Optional) | ||
| 7 | 8 | Power Switch | |
10 | 9 | Time Range Switch (Optional) | ||
| ||||
9 |
| 10 | Spot Time Control (Optional) | |
8 | 11 | Flowmeter (Optional) | ||
| ||||
|
|
|
|
|
|
| 151 780−A |
|
|
|
|
|
1 | 2 | 3 | Wear the following while welding: | |
|
|
| 1 | Dry, Insulating Gloves |
|
|
| 2 | Safety Glasses With Side |
|
|
|
| Shields |
|
|
| 3 | Welding Helmet With Correct |
|
|
|
| Shade Of Filter (See ANSI |
|
|
|
| Z49.1) |
|
|
|
| sb3.1 1/94 |
|
|
|
| |
|
|
| 1 | Work Clamp |
|
|
| Connect work clamp to a clean, | |
| 1 |
| ||
|
|
| close to weld area as possible. | |
|
| 2 | Use wire brush or sandpaper to | |
|
|
| clean metal at weld joint area. | |
|
|
| 2 | Voltage Sensing Cable Clamp |
|
|
| Connect voltage sensing cable | |
|
|
| clamp to workpiece for constant | |
Tools Needed: |
|
| current (CC) operations (see | |
|
|
| Section |
sb4.1* 2/93 − Ref. 144