Miller Electric OM-494 manual Servicing Fuel And Lubrication Systems

Page 40

8-4. Servicing Fuel And Lubrication Systems

9

Under Left Side

Of Fuel Tank Behind

Control Panel

5

6

Tools Needed:

3/8, 7/16, 3/4 in

7

4

1

2

Valve Open

8

I

 

3

2

O

YStop engine and let cool.

1 Oil Filter

2 Oil Drain Plug

3 Oil Drain Hose (Optional)

4 Oil Fill Cap

5Primary Fuel Filter (Fuel/ Water Separator)

6Petcock

7Secondary Fuel Filter

8Fuel Shutoff Valve Lever

9Sludge Drain Plug

To change oil and filter:

See engine manual.

To drain water from fuel system:

Open primary fuel filter petcock and drain water into metal container. Close petcock when water-free fuel flows.

To replace primary fuel filter:

Close shutoff valve and turn filter counterclockwise. Remove filter.

Apply thin coat of fuel to gasket on new filter. Install new filter and turn clockwise. Open shutoff valve. Bleed air from fuel system accord- ing to engine manual.

Inspect fuel line, and replace if cracked or worn.

To replace secondary fuel filter:

See engine manual.

To drain sludge from fuel tank:

.This procedure should only be

done by a Factory Authorized Service Agent.

Remove Welder A (left) control panel to access sludge drain plug.

Put metal container under drain and remove plug. Reinstall plug when sludge has drained.

Reinstall control panel.

YAfter servicing, start engine and check for fuel leaks.

YStop engine, tighten connec- tions as necessary, and wipe up spilled fuel.

Close doors.

Ref. 158 633-C / Ref. 190 377 / Ref. S-176 697

OM-494 Page 36

Image 40
Contents Processes DescriptionVisit our website at OM-494191 862P January Dual-Operator Engine Driven Welding GeneratorFrom Miller to You Table of Contents Options and Accessories Warranty Symbol Usage Arc Welding HazardsEngine Hazards Compressed Air Hazards Principal Safety Standards California Proposition 65 WarningsEMF Information Radiation can cause interferenceSignification des symboles − Consignes DE Sécurité − Lire Avant UtilisationUN Choc Électrique peut tuer LES Fumées ET LES GAZ peuvent être dangereuxLE Soudage peut provoquer un in- cendie ou une explosion DES Particules Volantes peuvent blesser les yeuxDES Pièces Chaudes peuvent provoquer des brûlures graves LE Bruit peut affecter l’ouïe’EXPLOSION DE LA Batterie peut DES Organes Mobiles peuvent provoquer des blessuresLA Chaleur DU Moteur peut pro- voquer un incendie ’AIR Comprimé peut provoquer des blessuresPrincipales normes de sécurité Information sur les champs électromagnétiquesSymbols And Definitions − Definitions− Specifications Weld, Power, And Engine SpecificationsDimensions, Weights, And Operating Angles DescriptionAC Generator Power Fuel ConsumptionExceeding duty cycle can damage unit and void warranty Duty Cycle And OverheatingOverheating Reduce Duty Cycle MinutesCC/DC − Single Mode CC/DC − Dual ModeCV/DC Mode Volt-Ampere Curves− Installation Installing Welding GeneratorActivating The Dry Charge Battery Do not overfill battery cellsRead and follow all instruc ChargerConnecting The Battery Installing Exhaust PipeConnect − Cable Last Top View Tools Needed 1/2Fuel Do not use gasoline. Gaso Line will damage engine Engine Prestart ChecksOil Safety Information For Connecting To Weld Output Terminals Weld Output TerminalsUnexpected Weld Output can cause injury or fire Welder a Left Side Welder B Right SideWelder a Left Side Do not exceed machine duty cycleStop engine Do not exceed machine duty cycle Connect electrode holder cables to Elec- trode receptaclesPlace optional Polarity switches in Re Verse position when using CV weld reWhen switch is in Straight position Switches are set correctly. See SectionConnect wire feeder cables to Negative − terminals Connect wire feeder cables to CV recep- taclesBe sure Process Selector switches are Place optional Polarity switch in Re Making Single Operator CC Weld Connections Selecting Weld Cable Sizes 150 ft 200 ft 250 ft350 ft 400 ft 45 m 60 m 70 m 90 m 105 m 120 m Put terminalsInstalling Ether Cylinder Optional Ether Starting Aid After installing cylinder, wait atRemote 14 Receptacle Information Socket InformationRemote 14 Receptacle Connections Dual Operator Operation− Operating the Welding Generator Engine ControlsSee -3for weld control descriptions If light goes on, stop engine and check engine beltWeld Controls See Section Do not switch under load or with out- put on Do not switch under loadWeld Control Descriptions See Section CV weld output for MIG is only available− Maintenance & Troubleshooting − Operating Auxiliary EquipmentEvery 100 h Every 200 hEvery 250 h Every 500 hMaintenance Label Servicing Air Cleaner By the warrantyTo clean air filter Do not clean housing with air hoseServicing Fuel And Lubrication Systems Adjusting Engine Speed Weld/Power 1850Servicing Optional Ether Starting Aid CylinderTo adjust belt tension Checking And Replacing Alternator BeltMax Tools Needed 11/16 Stop engine To check belt tensionResetting Fan Belt Safety Shutdown Inspecting And Cleaning Optional Spark Arrestor Muffler Reinstall cleanout plug Tools Needed 3/8Circuit Protection Thermostats TP3 And TP4 Internal − Not ShownTroubleshooting WeldingFactory Authorized Service Agent check main rectifier SR2 Factory Authorized Service Agent check main rectifier SR3Repair or replace wire feeder Formers T5 thru T10, and control board PC1 or PC5Generator Power EngineOM-494 − Electrical Diagrams Circuit Diagram For Welding Generator210 657-A Wetstacking − RUN-IN ProcedureMent damage may occur Run-In Procedure Using Load Bank 4exceed duty cycle or equip- ment damage may occurCheck oil level frequently dur Ing run-in add oil if neededRun-In Procedure Using Resistance Grid Procedure at less thanBank/grid From flammables− Generator Power Guidelines Has this symbolSelecting Equipment Grounding Generator To Truck Or Trailer FrameGrounding When Supplying Building Systems How Much Power Does Equipment Require?Earth ground if supplying Use ground device as stated Electrical codesApproximate Power Requirements For Industrial Motors Approximate Power Requirements For Farm/Home EquipmentIndustrial Motors Rating Starting Watts Running Watts Farm/Home Equipment Rating Starting Watts Running WattsApproximate Power Requirements For Contractor Equipment Contractor Rating Starting Watts Running WattsPower Required To Start Motor How Much Power Can Generator Supply?Single-Phase Induction Motor Starting Requirements KVA/HP x HP x 1000 = Starting AmperageTypical Connections To Supply Standby Power Selecting Extension Cord Use Shortest Cord Possible Current Load Watts Amperes− Parts List 311 103 96−SEE -2 101 25−SEE FIG 9104748 57−SEE FIG 78−SEE FIG Item Dia Part Description Quantity Mkgs 189 Front Panel Front Panel -1Item Side Control Panels − Welder B Right Side Shown Side Control Panels -1Item Side Control Panels Generator Rectifier Assembly OM-494 Page Your distributor also gives ServiceSupport To locate a Distributor or Service Agency visit Miller Electric Mfg. CoFor assistance in filing or settling claims, contact Your distributor and/or equipment manufacturer’s