GE AK-50 installation instructions Trip unit mounting bracket attached to the mounting Plate

Page 10

Figure 13. Trip unit mounting bracket attached to the mounting

plate.

10

Image 10
Contents Introduction Table of Contents List of Figures Before Installation General InformationFront Frame Breaker Conversion Relocating and Remounting the W and X RelaysInstalling the Flux Shifter Assembly Breakers with EC or Power Sensor Trip Systems Breakers with a Side Bracket AKU-50 Breakers OnlyAdjusting the Flux Shifter Installing the Trip PaddleBreakers with ECS or SST Trip Systems EC or Power Sensor Trip System Installing the Trip Unit Mounting BracketECS or SST Trip System Trip unit mounting bracket attached to the mounting Plate Back Frame Conversion Crossbar ModificationAK-50 & AKS-50 Breakers with SST Trip Systems Removing the Existing Trip DevicesAK-75 & AK-100 Breakers with SST Trip Systems Installing the Phase Sensors AK-50 & AKS-50 BreakersPhase sensor installation on AK-75 & AK-100 breakers AK-75 & AK-100 BreakersInstalling the Trip Unit Configuring the Trip UnitInstalling the Fourth-Wire Disconnect FOUR-WIRE Ground Fault OptionAK-50 & AKS-50 Stationary Breakers AK-50 & AKS-50 Draw-Out Breakers AK-75 & AK-100 Draw-Out BreakersAK-75 & AK-100 back frame conversion Installing the Neutral Sensor Outline of the neutral sensor for AK-50 breakersOutline of the neutral sensor for AK-75 and AK-100 breakers Installing Mounting Brackets Equipment ConversionFourth-wire disconnect for AKD-5 & AKD-6 Trouble-Shooting Testing and TROUBLE- ShootingTesting Nuisance Tripping on Ground Fault-Equipped BreakersAK-50 Page Page Appendix Drill Templates Appendix 1. Drill Template for Flux Shifter MountingPage Page Page Page GE Industrial Systems