GE AK-50 Appendix Drill Templates, Appendix 1. Drill Template for Flux Shifter Mounting

Page 27

APPENDIX – DRILL TEMPLATES

Appendix 1. Drill Template for Flux Shifter Mounting

27

Image 27
Contents Introduction Table of Contents List of Figures General Information Before InstallationRelocating and Remounting the W and X Relays Front Frame Breaker ConversionBreakers with EC or Power Sensor Trip Systems Installing the Flux Shifter AssemblyAKU-50 Breakers Only Breakers with a Side BracketInstalling the Trip Paddle Adjusting the Flux ShifterBreakers with ECS or SST Trip Systems Installing the Trip Unit Mounting Bracket EC or Power Sensor Trip SystemECS or SST Trip System Trip unit mounting bracket attached to the mounting Plate Crossbar Modification Back Frame ConversionRemoving the Existing Trip Devices AK-50 & AKS-50 Breakers with SST Trip SystemsAK-75 & AK-100 Breakers with SST Trip Systems AK-50 & AKS-50 Breakers Installing the Phase SensorsAK-75 & AK-100 Breakers Phase sensor installation on AK-75 & AK-100 breakersConfiguring the Trip Unit Installing the Trip UnitFOUR-WIRE Ground Fault Option Installing the Fourth-Wire DisconnectAK-50 & AKS-50 Stationary Breakers AK-75 & AK-100 Draw-Out Breakers AK-50 & AKS-50 Draw-Out BreakersAK-75 & AK-100 back frame conversion Outline of the neutral sensor for AK-50 breakers Installing the Neutral SensorOutline of the neutral sensor for AK-75 and AK-100 breakers Equipment Conversion Installing Mounting BracketsFourth-wire disconnect for AKD-5 & AKD-6 Nuisance Tripping on Ground Fault-Equipped Breakers Testing and TROUBLE- ShootingTesting Trouble-ShootingAK-50 Page Page Appendix 1. Drill Template for Flux Shifter Mounting Appendix Drill TemplatesPage Page Page Page GE Industrial Systems