Agilent Technologies 5962-8200 service manual Constant Current CC Tests, CC Setup

Page 17

Verification and Performance Tests - 2

tttt

Loading Transient

vt

t

v

 

Unloading

Transient

Figure 2-2. Transient Waveform

a.Turn off the supply and connect the output as in Figure 2-1a with the oscilloscope across the +S and -S terminals.

b.Turn on the supply and program the output current to the maximum programmable value (Imax) and the voltage to the full-scale value in Table 2-2.

c.Set the load to the Constant Current mode and program the load current to 1/2 the power supply full-scale rated current.

d.Set the electronic load's transient generator frequency to 100 Hz and its duty cycle to 50%.

e.Program the load's transient current level to the supply's full-scale current value and turn the transient generator on.

f.Adjust the oscilloscope for a waveform similar to that in Figure 2-2.

g.The output voltage should return to within the specified voltage (v) in less than 100uS (t). Check both loading and unloading transients by triggering on the positive and negative slope. Record the voltage at time “t” in the performance test record card under CV Transient Response.

Constant Current (CC) Tests

CC Setup

Follow the general setup instructions in the Measurement Techniques paragraph and the specific instructions given in the following paragraphs.

Current Programming and Readback Accuracy

This test verifies that the current programming and readback are within specification.

a.Turn off the supply and connect the current monitoring resistor across the power supply output and the DVM across the resistor. See "Current Monitoring Resistor" for connection information.

b.Turn on the supply and program the output voltage to 5 V and the current to zero amps. The power supply’s current detector must be set to DC and the programming language mode to SCPI. See the specifications for high range current readback in the User’s Guide if operating with the detector in ACDC or the language in Compatibility mode.

17

Image 17
Contents Agilent Part No Microfiche No September Certification Warranty InformationBefore Applying Power Safety SummarySymbol Description Safety Symbol DefinitionsInstrument Identification Printing HistoryTable of Contents Disassembly Procedures Initialization ROM UpgradePost-repair Calibration IntroductionPage Organization Safety ConsiderationsRelated Documents ChapterElectrostatic Discharge RevisionsManual Revisions Firmware RevisionsTest Equipment Required IntroductionMeasurement Techniques Test SetupType Specifications Recommended Model Electronic Load Test SetupPerformance Tests Operation Verification TestsCurrent-Monitoring Resistor ProgrammingConstant Voltage CV Tests CV SetupVoltage Programming and Readback Accuracy CV Load EffectCV Noise Pard Transient Recovery TimeCV Source Effect Current Programming and Readback Accuracy CC SetupConstant Current CC Tests Low Range Current Readback Accuracy Current Sink -CC OperationCC Load Effect CC Load and Line RegulationCC Noise Pard CC Source EffectPerformance Test Equipment Form Transient Response Load Effect Source Effect Pard Ripple and NoiseConstant Current Tests Current Programming and Readback Current Sink @ -3A Readback MA Range Current ReadbackLoad Effect Vout − Vout + 2.0mV Vout −Source Effect Vout − Iout −Iout − Iout + 0.2 mA Vout + 4 mVIout − Iout + 2.2 mA Current Sink @ -0.6A Readback Iout −Iout − Iout + 0.1 mA Load Effect Vout − Vout + 5 mVIout − Iout + 1.1 mA Current Sink @ -0.3A Readback Iout −Page Troubleshooting Flow Charts Overall TroubleshootingTest Equipment Required for Troubleshooting Type Purpose Recommended ModelSheet 1. Troubleshooting Flowchart Sheet 2. Troubleshooting Flowchart Sheet 3. Troubleshooting Flowchart Sheet 4. Troubleshooting Flowchart Power-on Self-test Failures Specific Troubleshooting ProceduresSelf-Test Error Codes/Messages Error Code Description Probable CauseBias and Reference Supplies CV/CC Status Annunciators TroubleshootingBias and Reference Voltages Bias Test Point MeasurementVoltage Measurements at J207 A2 Interface to A1 Main board J307 Voltage MeasurementsManual Fan Speed Control Disabling Protection FeaturesPost-repair Calibration Inhibit Calibration SwitchCalibration Password Upgrade Procedure ROM UpgradeInitialization Identifying the FirmwareList of Required Tools Disassembly ProceduresFront Panel Assembly, Removal and Replacement Cover, Removal and ReplacementA2 Interface Board, Removal and Replacement A1 Main Control Board A3 Front Panel Board, Removal and ReplacementT1 Power Transformer, Removal and Replacement Line Voltage Wiring Connector Signal Description Interface SignalsPower Supply Interface signals A2 Interface Circuits A3 Front Panel CircuitsPrimary Interface Secondary InterfaceA1 Main Board Circuits Power CircuitsControl Circuits Principles of Operation Page Designator PartNumber Qty Description Chassis, ElectricalReplaceable Parts List Mechanical Parts Identification MP9 Chassis, MechanicalDiagrams Diagrams A2/A3 Boards Block Diagram Circuits BiasIndex Index