Agilent Technologies 5962-8200 service manual A3 Front Panel Board, Removal and Replacement

Page 41

Troubleshooting - 3

A3 Front Panel Board, Removal and Replacement

First remove the front panel assembly as described under, "Front Panel Assembly, Removal and Replacement." Once you have access to the front panel board perform these steps:

a.Remove the RPG knob by pulling it away from the front panel.

b.Pull back the right side of the board near the RPG about 1/8th of an inch. Slide the board to the left to disengage the holding clips.

c.To reinstall the Front Panel board, perform the above steps in reverse order.

A1 Main Control Board

a.Remove the top cover and the A2 Interface board as described above.

b.Disconnect all cables going to connectors on the main control board.

NOTE: Be sure to note the position and orientation of all cables prior to removal so that no mistake is made later when reinstalling these cables.

c.Disconnect the ground wire between the main board and the chassis. This wire is secured to the side of the chassis near the AC input by a Torx T10 screw.

d.Remove two Torx T15 screws which secure the main control board to the chassis.

e.Remove the Torx 15 screw that holds the main rectifier in the front right corner of the board.

f.Slide the main board towards the front panel to release it from chassis mounted standoff and then lift the board out of the chassis.

T1 Power Transformer, Removal and Replacement

To remove the power transformer, the front panel assembly must first be removed to gain access to the bracket screws that hold the transformer in place.

a.Remove the front panel assembly as described above.

b.Remove the two Torx T10 screws securing the rear of the transformer bracket to the bottom of the chassis and the two screws securing the front of the bracket.

c.Use long nose pliers to disconnect all wires going to the transformer terminals.

d.Lift the transformer out of the chassis.

NOTE: The AC power connections at the transformer primary are line voltage dependent. Refer to Figure 3-3 subsequent reconnection.

41

Image 41
Contents Agilent Part No Microfiche No September Certification Warranty InformationBefore Applying Power Safety SummarySymbol Description Safety Symbol DefinitionsInstrument Identification Printing HistoryTable of Contents Disassembly Procedures Initialization ROM UpgradePost-repair Calibration IntroductionPage Organization Safety ConsiderationsRelated Documents ChapterElectrostatic Discharge RevisionsManual Revisions Firmware RevisionsTest Equipment Required IntroductionMeasurement Techniques Test SetupType Specifications Recommended Model Electronic Load Test SetupPerformance Tests Operation Verification TestsCurrent-Monitoring Resistor ProgrammingConstant Voltage CV Tests CV SetupVoltage Programming and Readback Accuracy CV Load EffectCV Noise Pard Transient Recovery TimeCV Source Effect Current Programming and Readback Accuracy CC SetupConstant Current CC Tests Low Range Current Readback Accuracy Current Sink -CC OperationCC Load Effect CC Load and Line RegulationCC Noise Pard CC Source EffectPerformance Test Equipment Form Transient Response Load Effect Source Effect Pard Ripple and NoiseConstant Current Tests Current Programming and Readback Current Sink @ -3A Readback MA Range Current ReadbackLoad Effect Vout − Vout + 2.0mV Vout −Source Effect Vout − Iout −Iout − Iout + 0.2 mA Vout + 4 mVIout − Iout + 2.2 mA Current Sink @ -0.6A Readback Iout −Iout − Iout + 0.1 mA Load Effect Vout − Vout + 5 mVIout − Iout + 1.1 mA Current Sink @ -0.3A Readback Iout −Page Troubleshooting Flow Charts Overall TroubleshootingTest Equipment Required for Troubleshooting Type Purpose Recommended ModelSheet 1. Troubleshooting Flowchart Sheet 2. Troubleshooting Flowchart Sheet 3. Troubleshooting Flowchart Sheet 4. Troubleshooting Flowchart Power-on Self-test Failures Specific Troubleshooting ProceduresSelf-Test Error Codes/Messages Error Code Description Probable CauseBias and Reference Supplies CV/CC Status Annunciators TroubleshootingBias and Reference Voltages Bias Test Point MeasurementVoltage Measurements at J207 A2 Interface to A1 Main board J307 Voltage MeasurementsManual Fan Speed Control Disabling Protection FeaturesPost-repair Calibration Inhibit Calibration SwitchCalibration Password Upgrade Procedure ROM UpgradeInitialization Identifying the FirmwareList of Required Tools Disassembly ProceduresFront Panel Assembly, Removal and Replacement Cover, Removal and ReplacementA2 Interface Board, Removal and Replacement A1 Main Control Board A3 Front Panel Board, Removal and ReplacementT1 Power Transformer, Removal and Replacement Line Voltage Wiring Connector Signal Description Interface SignalsPower Supply Interface signals A2 Interface Circuits A3 Front Panel CircuitsPrimary Interface Secondary InterfaceA1 Main Board Circuits Power CircuitsControl Circuits Principles of Operation Page Designator PartNumber Qty Description Chassis, ElectricalReplaceable Parts List Mechanical Parts Identification MP9 Chassis, MechanicalDiagrams Diagrams A2/A3 Boards Block Diagram Circuits BiasIndex Index