Agilent Technologies 5962-8200 service manual Overall Troubleshooting, Flow Charts

Page 28

3 - Troubleshooting

Test Equipment Required

Table 3-1 lists the test equipment required to troubleshoot the power supply. Recommended models are listed.

Table 3-1. Test Equipment Required for Troubleshooting

Type

Purpose

Recommended Model

GPIB Controller

To communicate with the supply via the

HP Series 200/300

 

GPIB interface

 

 

Digital Voltmeter

To check various voltage levels

Agilent

3458A

Oscilloscope

To check waveforms and signal levels

Agilent

54504A/54111A

Electronic Load

To test operation of current circuit

Agilent

6060B (60V) or 6063B

 

 

(240V)

 

Ammeter/Current

To measure output current

Guildline 9230/15

Shunt

 

 

 

Overall Troubleshooting

Overall troubleshooting procedures for the power supply are given in the Figure 3-1. The procedures first check that neither an AC input, nor a bias supply failure is causing the problem and that the supply passes the turn-on self test (error annunciator stays off). The normal turn-on, self-test indications are described in the "Checkout Procedure" in Chapter 3 of the User's Guide.

If the supply passes the self test and there are no obvious faults, you should perform the verification procedures in Chapter 2 from the front panel to determine if any functions are not calibrated or are not operating properly. Then program and read back a voltage via the GPIB to see if the supply responds properly to bus commands. If the supply fails any of the tests, you will be directed to the applicable flow chart or troubleshooting procedure.

Flow Charts

Troubleshooting flow charts are given in Figure 3-1 sheets 1-4. The flow charts make reference to the test points listed in Chapter 6. The circuit locations of the test points are shown on the component location diagrams in Chapter 6.

28

Image 28
Contents Agilent Part No Microfiche No September Warranty Information CertificationSafety Summary Before Applying PowerSafety Symbol Definitions Symbol DescriptionPrinting History Instrument IdentificationTable of Contents Initialization ROM Upgrade Disassembly ProceduresPost-repair Calibration IntroductionPage Safety Considerations OrganizationRelated Documents ChapterRevisions Electrostatic DischargeManual Revisions Firmware RevisionsIntroduction Test Equipment RequiredType Specifications Recommended Model Test SetupMeasurement Techniques Test Setup Electronic LoadOperation Verification Tests Performance TestsCurrent-Monitoring Resistor ProgrammingCV Setup Constant Voltage CV TestsVoltage Programming and Readback Accuracy CV Load EffectCV Source Effect Transient Recovery TimeCV Noise Pard Constant Current CC Tests CC SetupCurrent Programming and Readback Accuracy Current Sink -CC Operation Low Range Current Readback AccuracyCC Load and Line Regulation CC Load EffectCC Source Effect CC Noise PardPerformance Test Equipment Form Load Effect Source Effect Pard Ripple and Noise Transient ResponseConstant Current Tests Current Programming and Readback Current Sink @ -3A Readback MA Range Current ReadbackVout − Load Effect Vout − Vout + 2.0mVSource Effect Vout − Iout −Vout + 4 mV Iout − Iout + 0.2 mAIout − Iout + 2.2 mA Current Sink @ -0.6A Readback Iout −Load Effect Vout − Vout + 5 mV Iout − Iout + 0.1 mAIout − Iout + 1.1 mA Current Sink @ -0.3A Readback Iout −Page Troubleshooting Overall Troubleshooting Flow ChartsTest Equipment Required for Troubleshooting Type Purpose Recommended ModelSheet 1. Troubleshooting Flowchart Sheet 2. Troubleshooting Flowchart Sheet 3. Troubleshooting Flowchart Sheet 4. Troubleshooting Flowchart Specific Troubleshooting Procedures Power-on Self-test FailuresSelf-Test Error Codes/Messages Error Code Description Probable CauseCV/CC Status Annunciators Troubleshooting Bias and Reference SuppliesBias and Reference Voltages Bias Test Point MeasurementJ307 Voltage Measurements Voltage Measurements at J207 A2 Interface to A1 Main boardDisabling Protection Features Manual Fan Speed ControlCalibration Password Inhibit Calibration SwitchPost-repair Calibration ROM Upgrade Upgrade ProcedureInitialization Identifying the FirmwareDisassembly Procedures List of Required ToolsA2 Interface Board, Removal and Replacement Cover, Removal and ReplacementFront Panel Assembly, Removal and Replacement T1 Power Transformer, Removal and Replacement A3 Front Panel Board, Removal and ReplacementA1 Main Control Board Line Voltage Wiring Power Supply Interface signals Interface SignalsConnector Signal Description A3 Front Panel Circuits A2 Interface CircuitsPrimary Interface Secondary InterfacePower Circuits A1 Main Board CircuitsControl Circuits Principles of Operation Page Chassis, Electrical Designator PartNumber Qty DescriptionReplaceable Parts List Mechanical Parts Identification Chassis, Mechanical MP9Diagrams Diagrams A2/A3 Boards Block Diagram Bias CircuitsIndex Index