Roberts Gorden CRV-B-10, CRV-B-8, CRV-B-9, CRV-B-12A Kg per foot Corayvac Classic Cast-Iron Adapter

Page 36

CRV-SERIES INSTALLATION, OPERATION AND SERVICE MANUAL

Step 8.9 Classic Cast-Iron Components

WARNING

Suspension Hazard

Hang heater with materials with a minimum working load of 750 lbs. (340 kg).

Use special tube and reflector hangers when suspending the schedule 40 steel pipe system.

Schedule 40 steel pipe is heavy and will fall

if not supported properly.

Distance between supports must be 7' (2.13 m) or less.

Failure to follow these instructions can result in death, injury or property damage.

Special Tube and Reflector Hanger

7' (2.13 m) Maximum

Turnbuckle

Hang cast-iron combustion chamber with a turnbuckle (spring clips will not fit around cast-iron hanging loop).

End Vent

Clips

Schedule 40 Steel Pipe

ROBERTS-GORDON®

Cast-Iron Combustion Chamber with Schedule 40 Steel Pipe The total weight of each burner and combustion chamber is 40.25 lbs (18 kg). 4" Schedule 40 pipe weighs 10.9 lbs.

(5 kg) per foot.

Coupling

4" Tube

Cast-Iron Combustion Chamber with Standard 4" O.D. Infrared Tubing The total weight of each burner and combustion chamber is 40.25 lbs (18 kg). 4" O.D. 16 Ga. tubing weighs 2.8 lbs.

(1.3 kg) per foot.

CORAYVAC® Classic

Cast-Iron Adapter

End Vent Plate for

 

End Burner Only

Cast-Iron Combustion

 

 

 

 

Chamber

 

 

 

 

 

 

End Vent

 

 

 

Clips

ROBERTS-GORDON®

 

 

 

 

 

End Vent Plate for

Cast-Iron Adapter

End Burner Only

 

Description

 

Part Number

 

Special Tube & Reflector Hanger

02790300

 

Turnbuckle

 

91903201

 

Cast-Iron Combustion Chamber

02721200-1P

 

Cast-Iron Adapter

 

02722100

 

Coupling

 

01312700

30

Image 36
Contents CoRayVac Page Roberts GORDON, LLC Page Table of Figures Page Heater Safety Manpower RequirementsInstaller Responsibility Wall TagCorrosive Chemicals National Standards and Applicable CodesMaintain clearances to combustibles at all times for safety Standard Reflector ONE Side ReflectorUniversal SHIELD, Position Foot Deco Grille National Standards and Applicable Codes Coupling Assembly Tube Adapter Major ComponentsWith Lock Aluminum or Stainless Steel Reflector SideAdjustable Indoor Sensor Roberts Gordon UltravacVariable Frequency Drive Roberts GordonStandard Parts List Contents of CRV-Series Burner CartonProtective Grille Design Requirements Assembly Overview HeaterHeater Installation Critical Hanger PlacementTube Installation Coupling and Tube Assembly2 Elbow Installation ± 2 5 cmReflector Installation 1 Reflector Installation with Hole 2 Reflector InstallationScrew Wire Form Reflector Support Strap Burner Installation Burner Combustion Chamber Gasket End VentOptional Heater Accessories Tee InstallationReflector Joint 1 Reflector Joint Installation 2 Reflector Joint Installation 3 Reflector Joint DetailReflector Side Extension .3.1 Bracket Installation 2 Side Reflector InstallationSee Page 5, through Page 5, for positions Barrier Shield2 Frame Shield Installation Decorative Grille Bracket 2 Decorative Grille 3 Joint Piece and Reinforcement4 End Piece and Reflector End Cap Protective Grille Installation 1 Silicone Cap Installation 2 Grille End Cap Installation3 Grille Installation Kg per foot Corayvac Classic Cast-Iron Adapter Pump Installation and Venting 9.1 Pump Installation EP-200 Condensate Valve AssemblyVertical Venting Horizontal VentingUnited States Requirements Canadian RequirementsVertical Venting Configuration EP-100 Horizontal Venting Configurations Horizontal Venting 4 10 cm PipeEP-200 Series Horizontal Venting Configurations EP-300 Series Horizontal Venting Configurations Outside AIR Supply Non-PressurizedPressurized Duct Design RulesOutside Air Blower Internal Wiring Outside Air Blower Internal Wiring DiagramAir Supply Blower Support Non-Pressurized Outside Air Supply GAS Piping Gas Connection with Flexible Gas HoseControl Methods Roberts Gordon System ControlRoberts Gordon Ultravactm Dpst Transformer Relay P/N120 120 Two Zone Operation without Control Panel 60 Hz 12 Vdc 120 Ground 208 230 Burner Internal Wiring Setting the Vacuum Starting the SystemChecking the Gas Line Checking the Electrical SystemVacuum Reading Operation and Maintenance Pre-Season Maintenance and Annual InspectionSequence of Operation To Shut Off HeaterMaintenance Checklist Installation Code and Annual InspectionsVehicles and Other Objects ReflectorTubes Gas LineWindow Blower Scroll, WheelWith the Power off PumpChart StartTroubleshooting Flow Yes Follow burner check Procedure given aboveReplacement Parts DescriptionGeneral Specifications DimensionsPipe Connection GAS Inlet PressurePump Specifications Model EP-100 Air Supply Blower SpecificationsEP-203 EP-303Page Warranty is Void if ROBERTS-GORDON will not PAY forLimitations on Authority Representatives Page Owner Warranty Registration Card Page Page F r a r e d H e a t i n g
Related manuals
Manual 40 pages 12.87 Kb Manual 40 pages 29.7 Kb

CRV-B-4, CRV-B-12, CRV-B-2, CRV-B-10, CRV-B-6 specifications

The Roberts Gordon CRV-B-9 is a state-of-the-art infrared radiant heater designed for industrial and commercial heating applications. Renowned for its efficiency and effectiveness, the CRV-B-9 represents a significant advancement in the world of space heating solutions.

One of the main features of the CRV-B-9 is its advanced infrared technology, which allows for precise heating without the necessity of warming the entire space. This targeted heating provides immediate comfort, as it directly warms objects and people rather than the air around them, making it particularly effective in large warehouses, manufacturing facilities, and retail spaces.

The heater boasts an impressive output of up to 80,000 BTUs, making it suitable for a wide range of applications. It utilizes natural gas as fuel, which contributes to its efficiency and cost-effectiveness. With a robust design and durable construction, the CRV-B-9 is built to withstand the rigors of industrial environments while ensuring a long product lifespan.

Another significant characteristic of the CRV-B-9 is its ability to integrate with advanced control systems. This includes compatibility with programmable thermostats and energy management systems, allowing for optimized temperature control and reduced energy consumption. The heater can be adjusted to suit different operational needs, making it a flexible solution for various heating scenarios.

The CRV-B-9 also features a compact design, allowing for easy installation in a variety of spaces. Its low-profile shape and modular capability enable users to arrange multiple units to achieve the desired heating coverage without compromising floor space, a crucial aspect for busy, high-traffic areas.

Safety is a priority with the CRV-B-9, which is equipped with various safety features such as a flame safety cutoff switch and over-temperature protection. These mechanisms ensure safe operation, providing peace of mind for users in demanding environments.

In summary, the Roberts Gordon CRV-B-9 infrared radiant heater stands out for its innovative technology, impressive output, energy efficiency, and safety features. Its flexibility and robust design make it an ideal choice for businesses looking to enhance comfort while minimizing energy costs. Whether in a manufacturing plant or a retail outlet, the CRV-B-9 provides a reliable and effective heating solution.