Lochinvar Hot Water Generator 4Inspection, Recommended Inspections, Time Interval, Manufacturer

Page 11
4Inspection

Hot Water Generator Installation and Operation Manual

4Inspection

The following table summarizes the recommended time intervals for inspections of the water heater, components, inlet and outlet water, energy source lines (steam or boiler water), and power connections.

RECOMMENDED INSPECTIONS

 

 

 

Time Interval

 

 

 

 

 

 

 

 

To Be Inspected

Per

 

 

 

Semi-

 

Manufacturer

Weekly

Monthly

Quarterly

Annually

Quarterly

 

Specs

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Circulating Pump

￿

 

 

 

 

 

 

 

 

 

 

 

 

Control Valves -

￿

 

 

 

 

 

Temperature & Pressure

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gauges - Pressure &

 

 

 

￿

 

 

Temperature

 

 

 

 

 

 

 

 

 

 

 

Lines - Inlet, Outlet, &

 

 

 

￿

 

 

Return

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Power Connections

 

 

 

￿

 

 

 

 

 

 

 

 

 

Pressure Relief Valve

￿

 

 

 

 

 

 

 

 

 

 

 

 

Shutoff Valves - Manual

 

￿

 

 

 

 

 

 

 

 

 

 

 

Single Solenoid Safety

 

 

 

 

￿

 

System

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Strainers

 

 

 

￿

 

 

 

 

 

 

 

 

 

Temperatures - Water &

 

 

 

￿

 

 

Operating

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Thermometer

 

 

￿

 

 

 

 

 

 

 

 

 

 

Traps - Main & Auxiliary

 

 

 

 

 

￿

 

 

 

 

 

 

 

Magnesium Anode Rods

 

 

 

 

 

￿

 

 

 

 

 

 

 

RECOMMENDED INSPECTIONS 11 Time Interval

Image 11
Contents Unit shown with optional control package HOT WATER GENERATORDANGER ContentsHazard definitions Hot Water Generator Installation Instructions 1General informationAvailability Options Optional control packages see page1General information Figure 1 Vertical Tanks Figure 2 Horizontal TanksWARNING Areas of potential danger 1General information continuedFigure 3 Steam to Water Optional Control Package Figure 4 Water to Water Optional Control PackageFigure 6 Water to Water Storage Heater 2InstallationTransporting and unpacking the unit Figure 5 Steam to Water Storage HeaterUnit and components 2Installation continuedExamining the unit Mounting the unitSteam or boiler water Connecting the energy sourcePiping the relief valves to drain 2Installation2Installation continued Completing installation3Operation Startup procedureShutdown procedure Power Connections 4InspectionRECOMMENDED INSPECTIONS Time IntervalCORRECTIVE ACTION 5TroubleshootingSYMPTOM PROBABLE CAUSECORRECTIVE ACTION 5Troubleshooting continuedSYMPTOM PROBABLE CAUSECORRECTIVE ACTION 5TroubleshootingSYMPTOM PROBABLE CAUSEStorage tank maintenance 6MaintenanceFigure 8 Vertical Storage Tank w/Anodes 6MaintenanceMagnesium anode rod inspection Figure 7 Horizontal Storage Tank w/AnodesFigure 9 Pump Wiring Diagram 6Maintenance continuedComponents replacement replacement 6MaintenancePower connections - rewiring Tube bundle - inspection and replacement5.Replace the damaged section of line or valve 6Maintenance continuedStrainers - inspection and replacement 6MaintenanceTraps - replacement steam systems only 6Maintenance continued7Notes 7Notes HWG-i&o-01 CP-2M-12/05