![4Inspection](/images/new-backgrounds/35371/3537121x1.webp)
Hot Water Generator Installation and Operation Manual
4Inspection
The following table summarizes the recommended time intervals for inspections of the water heater, components, inlet and outlet water, energy source lines (steam or boiler water), and power connections.
RECOMMENDED INSPECTIONS
|
|
| Time Interval |
|
| ||
|
|
|
|
|
| ||
To Be Inspected | Per |
|
|
| Semi- |
| |
Manufacturer | Weekly | Monthly | Quarterly | Annually | |||
Quarterly | |||||||
| Specs |
|
|
|
| ||
|
|
|
|
|
| ||
|
|
|
|
|
|
| |
Circulating Pump |
|
|
|
|
| ||
|
|
|
|
|
|
| |
Control Valves - |
|
|
|
|
| ||
Temperature & Pressure |
|
|
|
|
| ||
|
|
|
|
|
| ||
|
|
|
|
|
|
| |
Gauges - Pressure & |
|
|
|
|
| ||
Temperature |
|
|
|
|
| ||
|
|
|
|
|
| ||
Lines - Inlet, Outlet, & |
|
|
|
|
| ||
Return |
|
|
|
|
| ||
|
|
|
|
|
| ||
|
|
|
|
|
|
| |
Power Connections |
|
|
|
|
| ||
|
|
|
|
|
|
| |
Pressure Relief Valve |
|
|
|
|
| ||
|
|
|
|
|
|
| |
Shutoff Valves - Manual |
|
|
|
|
| ||
|
|
|
|
|
|
| |
Single Solenoid Safety |
|
|
|
|
| ||
System |
|
|
|
|
| ||
|
|
|
|
|
| ||
|
|
|
|
|
|
| |
Strainers |
|
|
|
|
| ||
|
|
|
|
|
|
| |
Temperatures - Water & |
|
|
|
|
| ||
Operating |
|
|
|
|
| ||
|
|
|
|
|
| ||
|
|
|
|
|
|
| |
Thermometer |
|
|
|
|
| ||
|
|
|
|
|
|
| |
Traps - Main & Auxiliary |
|
|
|
|
| ||
|
|
|
|
|
|
| |
Magnesium Anode Rods |
|
|
|
|
| ||
|
|
|
|
|
|
|
11