Lochinvar Hot Water Generator Optional control packages see page, 1General information, Options

Page 4
Figure 1_Vertical Tanks

Hot Water Generator Installation and Operation Manual

1General information

Figure 1_Vertical Tanks

Figure 2_Horizontal Tanks

Optional control packages (see page 5)

Steam to Water -- Control packages include an isolation valve, 2-way self-operated temperature regulator, inlet and outlet wye strainers, a float and thermostatic steam trap and all necessary piping.

Water to Water -- Control packages include isolation valves, 2-way self-operated temperature regulator, inlet wye strainer and all necessary piping.

Options:

 

• Manual Reset High Limit

• Solenoid Valve

• Manway (see notes on manway)

• 150 psi Tank Working Pressure

• Temperature & Pressure Gauge

• Vacuum Breaker

4

Image 4
Contents HOT WATER GENERATOR Unit shown with optional control packageHazard definitions ContentsDANGER Availability 1General informationHot Water Generator Installation Instructions Optional control packages see page 1General informationFigure 1 Vertical Tanks Figure 2 Horizontal Tanks Options1General information continued Figure 3 Steam to Water Optional Control PackageFigure 4 Water to Water Optional Control Package WARNING Areas of potential danger2Installation Transporting and unpacking the unitFigure 5 Steam to Water Storage Heater Figure 6 Water to Water Storage Heater2Installation continued Examining the unitMounting the unit Unit and componentsConnecting the energy source Piping the relief valves to drain2Installation Steam or boiler waterCompleting installation 2Installation continuedShutdown procedure Startup procedure3Operation 4Inspection RECOMMENDED INSPECTIONSTime Interval Power Connections5Troubleshooting SYMPTOMPROBABLE CAUSE CORRECTIVE ACTION5Troubleshooting continued SYMPTOMPROBABLE CAUSE CORRECTIVE ACTION5Troubleshooting SYMPTOMPROBABLE CAUSE CORRECTIVE ACTION6Maintenance Storage tank maintenance6Maintenance Magnesium anode rod inspectionFigure 7 Horizontal Storage Tank w/Anodes Figure 8 Vertical Storage Tank w/AnodesComponents replacement 6Maintenance continuedFigure 9 Pump Wiring Diagram 6Maintenance Power connections - rewiringTube bundle - inspection and replacement replacement6Maintenance continued 5.Replace the damaged section of line or valve6Maintenance Strainers - inspection and replacement6Maintenance continued Traps - replacement steam systems only7Notes 7Notes HWG-i&o-01 CP-2M-12/05