Raypak 0180B, 0066B, 0042B manual Common Vents, Roof Pitch X/12 Min. ft

Page 10

Roof Pitch (X/12)

H (Min. ft)

Flat to 6/12

1

6/12 to 7/12

1.25

Over 7/12 to 8/12

1.5

Over 8/12 to 9/12

2

Over 9/12 to 10/12

2.5

Over 10/12 to 11/12

3.25

Over 11/12 to 12/12

4

Over 12/12 to 14/12

5

Over 14/12 to 16/12

6

Over 16/12 to 18/12

7

Over 18/12 to 20/12

7.5

Over 20/12 to 21/12

8

Refer to Fig. 4 for graphical reference

Table F: Minimum Height from Roof to Lowest

Discharge Opening

Fig. 5: Minimum Venting Measurements

WARNING: These boilers must not be connected into any portion of mechanical draft systems operating under positive pressure. To do so may cause the flue products to be discharged into the living space causing serious health injury.

For connections to gas vents or chimneys, vent instal- lations shall be in accordance with the Venting of Equipment section of the National Fuel Gas Code, ANSI Z223.1, or applicable provisions of the local building codes.

Common Vents

Manifolds that connect more than one boiler to a com- mon chimney must be sized to handle the combined load. Consult available guides for proper sizing of the manifold and the chimney. At no time should the area be less than the area of the largest outlet.

Fig. 6: Common Venting

10

Image 10
Contents Raytherm Residential Boilers Page Contents Pay Attention to These Terms PropositionGeneral Specifications Receiving EquipmentGas NPT Input Heating Net Piping ConnectionsCapacity RatingMounting Base InstallationCode Requirements Clearance RequirementsModel No Sq. in. of Free Area Combustion/Ventilation AirModel No Model No Vent Max Connector Horizontal Diameter Length ft Venting ConnectionsCommon Vents Roof Pitch X/12 Min. ftVent Damper Installation Location Vent Damper LocationMounting Vent Damper OperationFlair Damper AbbreviationDescriptionVent Damper Gas Pressure Gas Supply ConnectionsWater Connections & System Piping Model No System Flow Max. System Gpm Head ft/WC Piping Diagrams Single-Zone PipingElectrical Wiring Wiring Diagrams Page Page Single-Zone Taco Valve System with Three 3 Zone Pumps Primary/Secondary Pumping System Honeywell Zone Valve IID Units with Low Water Cut-off Device General Location of Controls Servicing ProceduresSequence Operation Intermittent Ignition Device IIDFor Standing Pilot Models START-UP ProceduresLighting the Boiler Filling the SystemTo Turn Off Gas to the Boiler Models 90, 135 For Automatic Ignition ModelsFor Honeywell valve Turn gas control knob Shut-down ProcedureTo Turn Off Gas to the Boiler For Honeywell valveTesting the Ignition Safety Shut-off Safe Shut-down TestsProcedure for Cleaning Flue Gas Passageways Inspection ProceduresLow Water Cut-Off When Installed BurnersHeat Exchanger Removal Repair ProceduresTube Cleaning Procedure Typical Burner Tray RemovalHeat Exchanger Re-assembly Combustion Chamber RemovalTroubleshooting Problem Causes SolutionsPiping Adjustment & Replacement of Components Fast-Response Temperature Sensor Probe Replacement Replacement Parts ListFast-Response Temperature Sensor Module Replacement Circulator ReplacementLimited Parts Warranty