Raypak 0066B, 0180B, 0042B manual Electrical Wiring

Page 18

Electrical Wiring

The electrical power supply requirement for these boil- ers is 120 VAC, 60 Hz. Field wiring connections and electrical grounding must comply with the local codes, or in the absence of local codes, with the latest edition of the National Electrical Code, ANSI/NFPA 70.

Provide a separate fused circuit from the main electri- cal panel to the boiler, and a disconnecting means within sight of the boiler.

Remove the control box cover and make the power supply connections in the field wiring compartment. (See general location of controls drawing on page 28). The pump is supplied and factory-wired to operate with the boiler. The "TH" wire leads are for the room thermostat or zone valve connections.

The room thermostat should be installed in accor- dance with the manufacturer's instructions. The thermostat heat anticipator should be set at 1.0 ampere (automatic ignition) and 0.60 ampere (stand- ing pilot) for single- zone installations. For multi-zone applications, the heat anticipator setting should be based on the ampere load in the thermostat circuit.

NOTE: If it is necessary to replace any of the original wiring, it must be replaced with 105°C wire or its equivalent, except 150°C black wire must be replaced with 150°C wire or its equivalent. See Fig. 19 for 150°C wire indication.

18

Image 18
Contents Raytherm Residential Boilers Page Contents Pay Attention to These Terms PropositionGeneral Specifications Receiving EquipmentGas NPT Input Heating Net Piping ConnectionsCapacity RatingMounting Base InstallationCode Requirements Clearance RequirementsCombustion/Ventilation Air Model No Sq. in. of Free AreaModel No Model No Vent Max Connector Horizontal Diameter Length ft Venting ConnectionsCommon Vents Roof Pitch X/12 Min. ftVent Damper Installation Location Vent Damper LocationMounting Vent Damper OperationFlair Damper AbbreviationDescriptionVent Damper Gas Supply Connections Gas PressureWater Connections & System Piping Model No System Flow Max. System Gpm Head ft/WC Piping Diagrams Single-Zone PipingElectrical Wiring Wiring Diagrams Page Page Single-Zone Taco Valve System with Three 3 Zone Pumps Primary/Secondary Pumping System Honeywell Zone Valve IID Units with Low Water Cut-off Device General Location of Controls Servicing ProceduresSequence Operation Intermittent Ignition Device IIDFor Standing Pilot Models START-UP ProceduresLighting the Boiler Filling the SystemTo Turn Off Gas to the Boiler Models 90, 135 For Automatic Ignition ModelsFor Honeywell valve Turn gas control knob Shut-down ProcedureTo Turn Off Gas to the Boiler For Honeywell valveTesting the Ignition Safety Shut-off Safe Shut-down TestsProcedure for Cleaning Flue Gas Passageways Inspection ProceduresLow Water Cut-Off When Installed BurnersHeat Exchanger Removal Repair ProceduresTube Cleaning Procedure Typical Burner Tray RemovalHeat Exchanger Re-assembly Combustion Chamber RemovalTroubleshooting Problem Causes SolutionsPiping Adjustment & Replacement of Components Fast-Response Temperature Sensor Probe Replacement Replacement Parts ListFast-Response Temperature Sensor Module Replacement Circulator ReplacementLimited Parts Warranty