Raypak 0066B, 0180B, 0042B manual Input Heating Net Piping Connections, Capacity, Gas NPT, Rating

Page 6

 

 

 

 

 

 

 

 

 

Model

Input

Heating

Net

Piping Connections

 

 

 

K

No.

MBH

Capacity

I=B=R

Water

 

Gas NPT

A

B

C

Vent

 

 

 

MBH

Rating

NPT

 

 

 

 

Dia.

H-0042

42

35

30

1 in.

 

1/2 in.

11 in.

5 3/4 in.

5 1/2 in.

4 in.

H-0066

66

54

47

1 in.

 

1/2 in.

11 in.

5 3/4 in.

5 3/4 in.

5 in.

H-0090

90

74

64

1 in.

 

1/2 in.

11 in.

5 3/4 in.

5 3/4 in.

5 in.

H-0135

135

109

95

1 1/4 in.

 

1/2 in.

18 in.

6 1/4 in.

6 1/4 in.

6 in.

H-0180

180

148

129

1 1/4 in.

 

1/2 in.

18 in.

6 1/4 in.

8 in.

7 in.

 

 

 

 

Table A:

 

Specifications

 

 

 

 

AUTOMATIC

 

B

 

VENT DAMPER

 

K

 

(FIELD INSTALLED)

 

 

INLET

 

 

 

 

31/

 

117/

OUTLET

8

8

 

 

M6IN

 

 

 

 

 

 

19

 

A

 

 

16

 

 

 

 

 

C

41/2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3/4 NPT PIPE

 

 

 

 

 

 

TO DRAIN

1/

 

 

 

 

 

33

4

 

 

 

31/4

18

 

THERMOSTAT CONN

 

 

(ELECTRICAL CONN

 

 

 

GAS

 

 

ON OTHER SIDE)

 

 

 

121/2

 

 

 

 

 

CONN

 

1/

 

1/

5

 

 

 

 

22

8

 

 

 

 

 

26

2

 

Fig. 1: Dimensions

6

Image 6
Contents Raytherm Residential Boilers Page Contents Pay Attention to These Terms PropositionGeneral Specifications Receiving EquipmentGas NPT Input Heating Net Piping ConnectionsCapacity RatingMounting Base InstallationCode Requirements Clearance RequirementsCombustion/Ventilation Air Model No Sq. in. of Free AreaModel No Model No Vent Max Connector Horizontal Diameter Length ft Venting ConnectionsCommon Vents Roof Pitch X/12 Min. ftVent Damper Installation Location Vent Damper LocationMounting Vent Damper OperationFlair Damper AbbreviationDescriptionVent Damper Gas Supply Connections Gas PressureWater Connections & System Piping Model No System Flow Max. System Gpm Head ft/WC Piping Diagrams Single-Zone PipingElectrical Wiring Wiring Diagrams Page Page Single-Zone Taco Valve System with Three 3 Zone Pumps Primary/Secondary Pumping System Honeywell Zone Valve IID Units with Low Water Cut-off Device General Location of Controls Servicing ProceduresSequence Operation Intermittent Ignition Device IIDFor Standing Pilot Models START-UP ProceduresLighting the Boiler Filling the SystemTo Turn Off Gas to the Boiler Models 90, 135 For Automatic Ignition ModelsFor Honeywell valve Turn gas control knob Shut-down ProcedureTo Turn Off Gas to the Boiler For Honeywell valveTesting the Ignition Safety Shut-off Safe Shut-down TestsProcedure for Cleaning Flue Gas Passageways Inspection ProceduresLow Water Cut-Off When Installed BurnersHeat Exchanger Removal Repair ProceduresTube Cleaning Procedure Typical Burner Tray RemovalHeat Exchanger Re-assembly Combustion Chamber RemovalTroubleshooting Problem Causes SolutionsPiping Adjustment & Replacement of Components Fast-Response Temperature Sensor Probe Replacement Replacement Parts ListFast-Response Temperature Sensor Module Replacement Circulator ReplacementLimited Parts Warranty
Related manuals
Manual 39 pages 210 b