Maytag HV640YBVITCGA, HV650HBVITCGA manual Customer Responsibilities, Product Specifications

Page 5

CUSTOMER RESPONSIBILITIES

Thank You for purchasing a Maytag water heater. Properly installed and maintained, it should give you years of trouble free service. It is strongly suggested that this new water heater be professionally installed, contact Maytag Customer Service (1-800-788-8899) for recommended installers.

Abbreviations Found In This Instruction Manual:

CSA - Canadian Standards Association

ANSI -American National Standards Institute

ASME - American Society of Mechanical Engineers

UL - Underwriters Laboratories Inc.

This gas-fired water heater is listed by Underwriters Laboratories Inc. underAmerican National Standard/CSAStandard for Gas Water Heaters ANSI Z21.10.1 • CSA 4.1 (current edition).

PREPARING FOR THE INSTALLATION

1.Read the “Safety Precautions” section, page 3 of this manual first and then the entire manual carefully. If you don’t follow the safety rules, the water heater will not operate properly. It could cause

DEATH,SERIOUSBODILYINJURYAND/ORPROPERTYDAMAGE.

This manual contains instructions for the installation, operation, and maintenance of the gas-fired water heater. It also contains warnings throughout the manual that you must read and be aware of. All warnings and all instructions are essential to the proper operation

of the water heater and your safety. Since we cannot put everything on the first few pages, READ THE ENTIRE MANUAL BEFORE

ATTEMPTING TO INSTALL OR OPERATE THE WATER HEATER.

2.The installation must conform with these instructions and the local code authority having jurisdiction. In the absence of local codes, installations shall comply with the Natural Gas and Propane Installation Code CAN/CSA B149.1 and the Canadian Electric Code CSA C22.1. These publications are available from Canadian Standards Association, 5060 Spectrum Way, Suite 100, Mississauga, Ontario, Canada L4W 5N6.

3.The water heater when installed must be grounded in accordance with the local codes, or in the absence of local codes, the Canadian Electric Code CSA C22.1.

4.If after reading this manual you have any questions or do not understand any portion of the instructions, call the local gas utility or

Maytag Customer Service at 1-800-788-8899 for an authorized servicer.

5.Carefully plan the place where you are going to put the water heater. Correct combustion, vent action, and vent pipe installation are very important in preventing death from possible carbon monoxide poisoning and fires.

Examine the location to ensure the water heater complies with the “Facts to Consider About the Location” section in this manual.

PRODUCT SPECIFICATIONS

 

TANK

 

 

RECOVERY

MINIMUM

 

 

 

CAPACITY

 

INPUT

RATE GALS.

VENTPIPE

DIAMETER

DIMENSIONSIN

MODEL

IN GALS.

TYPEOF

RATE

PERHOUR

INCHES

INCHES

INCHES(mm)HEIGHT

NUMBER

(LTRS)

GAS

(Btu/hr)

@ 90°F RISE

(mm)

(mm)

TOJACKETTOP

 

 

 

 

 

 

 

 

HV640YBVITCGA

40 (151)

NATURAL

40,000

44

2 (51)

18 1/2 (470)

55 (1,397)

 

 

 

 

 

 

 

 

HV650YBVITCGA

50 (189)

NATURAL

40,000

44

2 (51)

20 (508)

56 3/4 (1,441)

 

 

 

 

 

 

 

 

HV640HBVITCGA

40 (151)

PROPANE

40,000

44

2 (51)

18 1/2 (470)

55 (1,397)

 

 

 

 

 

 

 

 

HV650HBVITCGA

50 (189)

PROPANE

40,000

44

2 (51)

20 (508)

56 3/4 (1,441)

 

 

 

 

 

 

 

 

5

Image 5
Contents HV640YBVITCGA HV650YBVITCGA HV640HBVITCGA HV650HBVITCGA Series SixImportant Definitions Safe INSTALLATION, USE and ServiceSafety Precautions Table of Contents Preparing for the Installation Product SpecificationsAttempting to Install or Operate the Water Heater Customer ResponsibilitiesMaterials and Basic Tools Needed AccessoriesPropane HOT Surface Igniter & Main Burner Typical InstallationNatural HOT Surface Igniter & Main Burner Mixing Valve Usage Removing the Old Water Heater Installation InstructionsFacts to Consider about the Location Insulation Blankets ALL AIR from Inside Buildings See Hotter Water can Scald Water PipingValve and Pipe Insulation if supplied TEMPERATURE-PRESSURE Relief ValveGAS Piping GAS Piping with FlexibleconnectorSequenceofinstallation Blower Assembly InstallationSediment Traps Filling the Water HeaterVenting and Installation Vent Connections to Blower AssemblyMaximum Vent Lengths CondensationVenting Vent Terminal InstallationVertical Vent Restrictions Vertical Vent Through RoofRecommended BRUSH* Size for Primer Cement Applications Vent Pipe PreparationStepe StepbStepf Step GOperating Instructions PowerbeforeservicingDo not try to light the burner by hand What to do if YOU Smell GASTemperature Setting Burns on Adult Skin Temperature RegulationOperational Conditions For Your InformationStart UP Conditions Burner Cleaning Service and AdjustmentVenting System Inspection Burner Operation and InspectionDrain Valve Washer Replacement TEMPERATURE-PRESSURE Relief Valve OperationService Anode ROD Inspection DrainingLeakage Checkpoints Water Heater Control Troubleshooting GuidelinesTroubleshooting Guidelines Burner Assembly Outer Door Alternate Repair Parts ListMaytag GAS Water Heater HV640YBVITCGALimited Parts Warranty Full ONE Year WarrantyLimited Tank Warranty Against Leaks To Receive Warranty Service