VENT CONNECTIONS TO BLOWER ASSEMBLY

Figure 15 shows the optimal placement of the 2" to 3" or 3" to 4" reducer; however, the vent can be reduced at any point in the vent system as long as the maximum vent length is not exceeded.

FIGURE21.

VENTING AND INSTALLATION

Plan the layout of the vent system from the vent termination to the water heater considering all of the 90° and 45° elbows plus the number of feet of pipe that would be needed to install the total vent system. The water heater must be vented to the outdoors as described in these instructions. DO NOT connect this water heater to an existing vent or chimney. It must be vented separately from all other appliances. Nonmetallic vent may be used if it has “Heat Deflection Temperature” (HDT@66 psi) or 455 kPa of at least 157°F or 69°C. Typical nonmetallic vent materials meeting this requirement are: PVC (Schedule 40, ASTM D-1785), Coex Cellular Core (Schedule 40, ASTM F-441), CPVC (Schedule 40, ASTM D-2846), ABS (Schedule 40, ASTM D-2661). The fittings, other than the supplied Vent Termination should be equivalent to the following: PVC (Schedule 40, DWV, ASTM D-2665), CPVC (Schedule 40, DWV, ASTM F-438), ABS (Schedule 40 DWV, ASTM D-2661).

The cement used should be as recommended by the vent pipe manufacturer. See the instructions on pages 21 and 22 for the proper method of cutting and cementing the PVC pipe and fittings.

17

Image 17
Contents HV640YBVITCGA HV650YBVITCGA HV640HBVITCGA HV650HBVITCGA Series SixImportant Definitions Safe INSTALLATION, USE and ServiceSafety Precautions Table of Contents Preparing for the Installation Product SpecificationsAttempting to Install or Operate the Water Heater Customer ResponsibilitiesMaterials and Basic Tools Needed AccessoriesPropane HOT Surface Igniter & Main Burner Typical InstallationNatural HOT Surface Igniter & Main Burner Mixing Valve Usage Removing the Old Water Heater Installation InstructionsFacts to Consider about the Location Insulation Blankets ALL AIR from Inside Buildings See Hotter Water can Scald Water PipingValve and Pipe Insulation if supplied TEMPERATURE-PRESSURE Relief ValveGAS Piping GAS Piping with FlexibleconnectorSequenceofinstallation Blower Assembly InstallationSediment Traps Filling the Water HeaterVenting and Installation Vent Connections to Blower AssemblyMaximum Vent Lengths CondensationVenting Vent Terminal InstallationVertical Vent Restrictions Vertical Vent Through RoofRecommended BRUSH* Size for Primer Cement Applications Vent Pipe PreparationStepe StepbStepf Step GOperating Instructions PowerbeforeservicingDo not try to light the burner by hand What to do if YOU Smell GASTemperature Setting Burns on Adult Skin Temperature RegulationOperational Conditions For Your InformationStart UP Conditions Burner Cleaning Service and AdjustmentVenting System Inspection Burner Operation and InspectionDrain Valve Washer Replacement TEMPERATURE-PRESSURE Relief Valve OperationService Anode ROD Inspection DrainingLeakage Checkpoints Water Heater Control Troubleshooting GuidelinesTroubleshooting Guidelines Burner Assembly Outer Door Alternate Repair Parts ListMaytag GAS Water Heater HV640YBVITCGALimited Parts Warranty Full ONE Year WarrantyLimited Tank Warranty Against Leaks To Receive Warranty Service