Samsung AQV09EWEN manual Performing the gas leak tests, To check for gas leaks on the outdoor unit

Page 37

Performing the gas leak tests

Make sure to check for gas leaks before completing the installation process (connecting the assembly pipe and hose between indoor unit and outdoor unit, insulating the cables, hose and pipe, and fixing the indoor unit to the installation plate).

A C D

B

To check for gas leaks on the outdoor unit,

Check the valve A and B using a leak detector.

To check for gas leaks on the indoor unit,

Check the flare nut C and D using a leak detector.

Leak test with nitrogen (before opening valves)

In order to detect basic refrigerant leaks, before recreating the vacuum and recirculating the R410A, it’s responsible of installer to pressurize the whole system with nitrogen (using a cylinder with pressure reducer) at a pressure above 40 bar (gauge).

Leak test with R410A (after opening valves)

Before opening valves, discharge all the nitrogen from the system and create vacuum according to page 34~36. After opening valves, check leaks using a leak detector for refrigerant.

Pump down (before disconnecting the refrigerant connections for unit repair, removal or disposal)

Pump-down is an operation intended to collect all the system refrigerant in the outdoor unit.

This operation must be carried out before disconnecting the refrigerant tubing in order to avoid refrigerant loss to the atmosphere.

Shut off the liquid valve with the Allen wrench.

Turn the system on in cooling with fan operating at high velocity.

(Compressor will immediately start, provided 3 minutes have elapsed since the last stop).

After 2 minutes of operation, shut the suction valve with the same wrench.

Turn the system off and switch mains supply off.

Disconnect tubing. After disconnection, protect valves and tubing ends from dust.

Compressor damage may occur if run at a negative suction pressure.

ENGLISH

37

Vivaldi Cystal EUR_AQV09E@@ IB&IM_32449A_E.indd 37

2011-3-7 15:45:45

Image 37
Contents Vivaldi Cystal EURAQV09E@@ IB&IM32449AE.indd 2011-3-7 Contents Important safety symbols and precautions Safety precautionsFollow directions Wall socketFor Using For Cleaning Operation ranges Checking before useChecking the name of the parts PowerMain parts DisplayRemote controller buttons Checking the remote controllerBattery changing time Remote controller displayStoring the remote controller Inserting the batteriesBasic function Press Button to adjust the temperatureUsing the Turbo function Adjusting the air flow directionPress the Air swing button on the remote controller Vertical air flowPress the button on the remote controller When the air conditioner is on and in cool/heat modePress the Set/Cancel button to active it on ModePress the On Timer/Off Timer button Setting the On/Off timerPress the On Timer/Off Timer button to set the time Using the Smart Saver function Using the SPi functionUsing the Auto Clean function Using the Quiet functionWhen the air conditioner is turned on You can reduce the noise generated from an indoor unitCleaning the indoor unit Cleaning the air conditionerCleaning the outdoor unit heat exchanger Opening the panelRemoving the Air filter Cleaning the air filterOpen the panel and put the Air filter out Dry the Air filter in a ventilated areaPeriodical checks Maintaining the air conditionerTroubleshooting Flow movement changes. It is normal Outdoor unit Heat exchanger during Heat mode in winterConnection Included Models Remark General informationAQV09E, AQV12E, AQV18E, AQV24E Installing the unit Choosing the installation locationPower supply line, fuse or circuit breaker  a place where the air filter can be replaced easilyOutdoor Unit Where sulfide gas existsWhen the air outlet is towards the wall When installing more than 1 outdoor unit Figure Description Top view Side viewAccessories in the indoor unit case AccessoriesAccessories in the outdoor unit case Optional accessories Fixing the installation plateTools required for installation General Tools Tools for test operationsCable specification Connecting the assembly cableConnecting the cable Each wire is labeled with the corresponding terminal number Cut off the remaining foam insulation Smooth the cut edgesCutting or extending the pipe Purging the indoor unitUnscrew the caps at the end of each pipe Put a flare nut slightly into the pipe and modify the flareCorrect Inclined Pipe 50 Pa. The joint must be accessible and serviceableCracked Outer DiameterDrain hose installation Connect a drain hose to the drain plug Purging the connected pipesEnsure that condensation draining is adequate Adding Refrigerant  the factory refrigerant charge of the product Please fill in with indelible ink1975 To check for gas leaks on the outdoor unit Performing the gas leak testsTo check for gas leaks on the indoor unit Leak test with nitrogen before opening valvesThen place the indoor unit on the installation plate Outdoor unit installed on the wall by rackFixing the indoor unit in place Fixing the outdoor unit in placeFinal Check and Trial Operation Apply heat to the contraction tube to contract it How to connect your extended power cablesAfter tube contraction work is completed, wrap it with Insulation tape to finishEnglish 7267864, € 0.07/min 42 2770 70 19 +381Air Conditioner
Related manuals
Manual 23 pages 41.95 Kb Manual 23 pages 55.9 Kb Manual 25 pages 14.93 Kb Manual 39 pages 27.14 Kb