Desa
B350CEA Warranty And Repair Service, Certificate Of General, Corporate Headquarters
Parts list
Diagram
Problem
Unpacking Assembly
Procedure if pump is binding
Pump Pressure Adjustment
Safety
Service Procedures
Page 24
Page 23
Page 24
Image 24
Page 23
Page 24
Contents
Model B350CEA Heater Size 340,000 Btu/Hr
HIGH PRESSURE PORTABLE FORCED AIR HEATER
350 SIDE PFA/PV
CONTENTS SAFETY INFORMATION
WARNINGS
DANGER
SECTION
SAFETY INFORMATION
WARNINGS Continued
Continued
UNPACKING ASSEMBLY
PRODUCT IDENTIFICATION
TOOLS NEEDED
ASSEMBLY
Continued
Figure 2 - Wheel and Handle Assembly
THEORY OF
OPERATION
FUELS VENTILATION
Fresh Air Opening Requirements
340,000 Btu/Hr
10.5
OPERATION
To Start Heater
STORING
TRANSPORTING, OR SHIPPING
To Stop Heater
To Restart Heater
PREVENTATIVE MAINTENANCE SCHEDULE
How Often
How To
PROBLEM
TROUBLE- SHOOTING
OBSERVED
POSSIBLE CAUSE
High Voltage
PROBLEM
Pump Pressure Adjustment
TROUBLE- SHOOTING
REMEDY
PROBLEM
TROUBLE- SHOOTING
Continued
SERVICE PROCEDURES
Upper Shell Removal
Fan Blades
Figure 5 - Upper Shell Removal
Spark Plug
Nozzle
Figure 7 - Spark Plug Removal
Figure 8 - Spark Plug Gap
Pump Pressure Adjustment
Pump
Fuel Lines
Procedure if pump is binding
Fuel Filters
A. Tank Fuel Filter
B. Pump Fuel Filter
Figure 15 - Removing Tank Fuel Filter
WIRING
ACCESSORY
DIAGRAM
PARTS LIST
Burner Head Assembly
Motor and Pump Assembly
DESCRIPTION
ILLUSTRATED
PARTS
BREAKDOWN
PARTS LIST
EC CONFORMITY DECLARATION
EC CONFORMITY DECLARATION DESA Europe B.V
Innsbruckweg 144, NL-3047AH Postbus
NL-3004ED Rotterdam Holland Manufacturer
Page
WARRANTY AND REPAIR SERVICE
EQUIPMENT - LIMITED 90 DAY WARRANTY
CERTIFICATE OF GENERAL
WARRANTY SERVICE
Related pages
All Warranty page
What should I do if I cannot answer or disconnect calls using my headset?
Click for solutions
Top
Page
Image
Contents