Desa
B350CEA
owner manual
Unpacking Assembly, Product Identification, Tools Needed
Parts list
Diagram
Problem
Unpacking Assembly
Procedure if pump is binding
Pump Pressure Adjustment
Safety
Service Procedures
Page 4
Page 3
Page 5
Image 4
Page 3
Page 5
Contents
HIGH PRESSURE PORTABLE FORCED AIR HEATER
Model B350CEA Heater Size 340,000 Btu/Hr
350 SIDE PFA/PV
CONTENTS SAFETY INFORMATION
WARNINGS
DANGER
SECTION
WARNINGS Continued
SAFETY INFORMATION
Continued
PRODUCT IDENTIFICATION
UNPACKING ASSEMBLY
TOOLS NEEDED
Continued
ASSEMBLY
Figure 2 - Wheel and Handle Assembly
THEORY OF
OPERATION
FUELS VENTILATION
Fresh Air Opening Requirements
340,000 Btu/Hr
10.5
OPERATION
To Start Heater
STORING
TRANSPORTING, OR SHIPPING
To Stop Heater
To Restart Heater
How Often
PREVENTATIVE MAINTENANCE SCHEDULE
How To
PROBLEM
TROUBLE- SHOOTING
OBSERVED
POSSIBLE CAUSE
High Voltage
PROBLEM
Pump Pressure Adjustment
TROUBLE- SHOOTING
REMEDY
PROBLEM
TROUBLE- SHOOTING
Continued
SERVICE PROCEDURES
Upper Shell Removal
Fan Blades
Figure 5 - Upper Shell Removal
Spark Plug
Nozzle
Figure 7 - Spark Plug Removal
Figure 8 - Spark Plug Gap
Pump Pressure Adjustment
Pump
Fuel Lines
Procedure if pump is binding
Fuel Filters
A. Tank Fuel Filter
B. Pump Fuel Filter
Figure 15 - Removing Tank Fuel Filter
ACCESSORY
WIRING
DIAGRAM
PARTS LIST
Burner Head Assembly
Motor and Pump Assembly
DESCRIPTION
PARTS
ILLUSTRATED
BREAKDOWN
PARTS LIST
EC CONFORMITY DECLARATION
EC CONFORMITY DECLARATION DESA Europe B.V
Innsbruckweg 144, NL-3047AH Postbus
NL-3004ED Rotterdam Holland Manufacturer
Page
WARRANTY AND REPAIR SERVICE
EQUIPMENT - LIMITED 90 DAY WARRANTY
CERTIFICATE OF GENERAL
WARRANTY SERVICE
Related pages
All Assembly page
What features does the
Denon DRM-555
stereo system offer?
Top
Page
Image
Contents