Desa CDVBPC, CDVBNC installation manual Clearance for Corner Installation

Page 5

PRE-INSTALLATION PREPARATION

PRE-INSTALLATION PREPARATION

5

Location and Space Requirements (Cont.)

Continued

Ceiling

42"

36"

from

Front

Floor

4"

Back

Wall

Must contain a minimum

of 1" clearance to combustibles

4"

4"

Figure 4 - Clearance for Corner Installation

25"

Front

25 5/8"

Figure 5 - Stove with Burner System Bottom Dimensions

29"

4"

6"

Front

Figure 3 - Clearances for Standard Installation

For morevisit www..com

105501-01F

Image 5
Contents For Your Safety What to do if YOU Smell GAS OWNER’S Operation and Installation ManualFor Your Safety Safety Information Table of ContentsCleaning stove or burner system Safety Information Product IdentificationPRE-INSTALLATION Preparation Product FeaturesLocal Codes Glossary of TermsClearance for Corner Installation Stove Body Assembly Cast Iron Stove and DIRECT-VENT Burner System AssemblyCatch Bolt and Door Claw Orientation Installing DIRECT-VENT Burner System Into Stove BodyInstalling GA3750/CDA3620T Blowers Installing Optional Blower AccessoryLocation of Vent Termination Installing Rear CoverGeneral Venting General Venting Installation Planning Venting InstallationInstallation Precautions Installing Vent System in a Chase Installation for Horizontal TerminationInstalling Horizontal Vent Cap Noncombustible Exterior Horizontal Termination Configuration for Rigid Venting Horizontal Termination ConfigurationsFlat Ceiling Installation Installation for Vertical TerminationVertical Termination Configurations Cathedral Ceiling InstallationParts Lists for Venting Kits and Components High Altitude InstallationInstalling GAS Piping to STOVE/ Burner System Location Stove and DIRECT-VENT Burner System InstallationInstallation Items Needed Check GAS TypeChecking GAS Connections Connecting STOVE/BURNER System to GAS SupplyPressure Testing Gas Supply Piping System Turn off burner system see To Turn Off Gas to Appliance, Pressure Testing Burner System Gas ConnectionsREMOVING/REPLACING Glass Door Installing Remote ReceiverInstalling 9-Volt Battery in Hand-Held Remote Control Unit Removing Front Panel from Stove Installing LOGS, Lava Rock and Glowing EmbersLighting Instructions For Your Safety Read Before LightingOperating Stove with Burner System To Turn OFF GAS To Appliance Manual Lighting ProcedureOptional Remote Operation Shutting Off Burners Only pilot stays litCghrcta Series Operation Operating Optional Blower AccessoryCghrc Series Operation Inspecting Burners Pilot AssemblyOperating Optional GWMT1 Wall Mounted Thermostat Burner Flame PatternGlass Door Cleaning MaintenancePilot and Burners LogsObserved Problem Possible Cause TroubleshootingObserved Problem Possible Cause Remedy Gas leak. See Warning statement Replacement Parts Wiring DiagramSpecifications Parts Under WarrantyCdvbnc Cdvbpc Illustrated Parts BreakdownParts List Parts ListStove Chassis Cisc Cisg KEY Part Description QTY Cisc CisgAccessories Technical ServiceService Hints Owners Registration Form Postage Required 105501-01F Warranty Information