Procom SSU320RHL-G, SSU320RHN-GB, SSU320RHN-S, SSU320RHL-S Manual Lighting, Procedure match light

Page 13

MANUAL OPERATING INSTRUCTIONS

Continued

5.Wait five (5) minutes to clear out any gas. Then smell for gas, in- cluding near the floor. If you smell gas, STOP! Follow “B” in the safety information on page 11. If you do not smell gas, go to the next step.

6.Push in gas control slightly and

turn counterclockwise to PI- LOT/IGN and depress for five (5) seconds.

NOTE: The first time that the heater is operated after connect- ing the gas supply, the control knob should be depressed for about thirty (30) seconds. This will allow air to bleed from the gas system.

7.With Control Knob pressed in, push and release the ignitor button. This will light the pilot. If needed, keep pressing ignitor button until pilot lights.

8.Keep Control Knob depressed for ten (10) seconds after lighting pilot. If pilot goes out, repeat steps 6, 7 and 8.

9.Turn counterclockwise to “ON” position. Do not operate between locked positions.

TO TURN OFF GAS

TO APPLIANCE

Push in gas Control Knob slightly and turn clockwise the OFF position. Do not force.

When electric power is available and electric operation is desired, turn clock- wise to OFF position for one minute. Then press down knob and rotate clock- wise to ELECTRIC position.

Do not operate between locked position.

MANUAL LIGHTING

PROCEDURE (match light)

1.Open front door.

2.Follow steps 1 through 5 under MANUAL OPERATING Lighting Instructions.

3.With Control Knob in PILOT/IGN position, strike match, and hold near pilot. Press in Control Knob, pilot should light.

4.Keep Control Knob pressed in for 30 seconds after lighting pilot. After 30 seconds, release Control Knob. Fol- low step 9 under MANUAL OPER- ATING Lighting Instructions.

Figure 16 - Manual Control

13

Image 13
Contents What to do if YOU Smell GAS Installer Please leave these instructions with the consumerWATERVAPORABY-PRODUCTOFUNVENTED Room Heaters Table of Contents Do not place Propane/LP supply tank Local Codes Product FeaturesUnpacking Product IdentificationDetermining FRESH-AIR Flow for Heater Location AIR for Combustion and VentilationProviding Adequate Ventilation Unusually Tight ConstructionVentilation Air From Outdoors Ventilation Air From lnside BuildingCheck GAS Type InstallationInstallation Items Needed Connecting to GAS SupplyMinimum Wall and Ceiling Clearances Test Pressures In Excess Of 1/2 PSIG3.5kPa Checking GAS ConnectionsTest Pressures Equal To or Less Than 1/2 PSIG3.5 kPa Place log 4 on log 1 and log 3, as shown LOG PlacementOperating Heater For Your Safety Read Before LightingRemotecontrol Operating Instruction Manual Operating Instructions Operating FANManual Lighting Procedure match lightCleaning and MAIN- Tenance Mainburner CabinetAir Passageways ExteriorReplacement Parts SpecificationsService person should service TroubleshootingObserved Problem Possiblecause Remedy Before servicing. Only a qualifiedClean burner see Cleaning Observed Problem Possiblecause Part Number Description Illustrated Parts BreakdownQTY QTY