Monessen Hearth TPB30, TPB24 manual Minimum Mantel Clearance with No Hood -TPB18

Page 14

CLEARANCES AND HEIGHT REQUIREMENTS

10"

8"

6"

21/2"

Heat

Resistant

Material

8" 14" 201/2" 245/8" 28"

 

Example: A mantel may project from the wall a maximum of 21/2" at a mini-

 

Heater in

mum of 14" above the opening, and a maximum of 6" at a minimum

 

of 201/2" above the opening.

 

Fireplace or

 

 

 

Firebox

 

 

Figure 7 - Minimum Mantel Clearance with No Hood -TPB18

 

12"

 

 

10"

 

 

8"

 

 

6"

 

Heat

21/2"

 

Resistant

 

 

Material

 

 

 

8" 141/2" 185/8" 221/2"

26"

 

Hood

 

 

Example:

A mantel may project from the wall a maximum of 21/2" at a

 

Heater in

minimum of 8" above the opening, and a maximum of 6" at a mini-

 

Fireplace or

mum of 141/2" above the opening.

 

Firebox

 

 

Figure 8 - Minimum Mantel Clearance with Hood - All Models

14

70D0004

Image 14
Contents Read and Save These Instructions What to do if YOU Smell GASContents Owner Important Safety InformationInstaller Massachussetts Residents only Make Sure YOU have Received ALL Parts What YOU will Need for InstallationGetting Started Product Features and Specifications Adequate Combustion and Ventilation AIR General Installation InformationCodes BTU / Hr = Fireplace and Hearth Dimensions Hearth Minimum DimensionPlacement in a Fireplace with a Restrictive Barrier Height of Restriction Minimum Depth of Fireplace/FireboxClearances and Height Requirements Sidewall and Ceiling ClearancesClearances and Height Requirements Measuring Heat Resistant Material for Mantel Minimum Mantel Clearance with No Hood -TPB18 Mum of 10 at a minimum of 28 above the opening Floor Clearance Minimum Clearance above Combustible FlooringBefore Installing the Appliance Installing Vented ApplicationsBefore Fully Installing the Unit Damper Stop InstallationPlacing and Securing Appliance Installing Vented ApplicationsAssembly Procedure Connecting the GAS Flexible Tube Manual Shutoff Gas Supply Inlet ValveChecking GAS Pressure MILLI-VOLT Valve Control FigureATE Electrical Wiring MILLI-VOLTConnecting Optional Wall Switch or Thermostat Complete MILLI-VOLT System Check Connecting Remote ReceiverChecking System Operation LOG Placement Installing Charred Timber Logs on BurnerInstalling Left Base Log #3 Installing Left Top Log #5 Installing Right Top Log #6 Placing Rock WoolSteel BAR Grate Installation Riser and Steel BAR Grate InstallationOptional Riser Installation Andiron Installation Optional Cast Iron Grate and Andiron InstallationCast Iron Grate Installation Checking the Pilot Flame Flame AppearancePlacing the Decorative Rock MILLI-VOLT Control and Thermostat ControlChecking the Burner Flame Operating InstructionsOperating Instructions What to do if YOU Smell GASTo Turn OFF GAS to Heater Operating Instructions and Cleaning and Servicing Cleaning and ServicingTroubleshooting Observed Problem Possible Cause RemedyODS/pilot lights, but flame Replacement Parts Burner AssemblyReplacement Parts List Accessories Sold SeparatelyCharred Timber Logs CTCL18 CTCL24 CTCL3070D0004 Carbon Monoxide Detector Requirements Special Requirements Basic Warranty Lifetime WarrantyFive Year Warranty