GETTING STARTED

MAKE SURE YOU HAVE RECEIVED ALL PARTS:

Check your packing list to verify that all listed parts have been received. You should have the following:

• Unvented Gas Log Burner Assembly

• Two (2)

Plastic Bags Containing Crushed Volcanic Rock

Installation/Operating Instructions

• Two (2)

Anchoring Screws

• Ceramic Fiber Logs / Refractory Logs

Rock wool

Grate Assembly

On/Off Log Switch Assembly

The following options may be used with the milli-volt controlled heater. These options are not packaged with the log set.

• Hand Held Remote with Receiver

• Wall Thermostat with 15' Wire

Wall Switch with 15' Wire

Hand held Thermostat Remote with Receiver

Cast Iron Grate and Andirons

Riser Kit

CAUTION

Gloves are recommended when handling ceramic fiber logs to prevent skin irritation from loose fibers. Logs are fragile — handle with care.

Carefully inspect the contents for shipping damage. If any parts are missing or damaged, immediately inform the dealer from whom you purchased the appliance. Do not attempt to install any part of the appliance unless you have all parts in good condition.

WHAT YOU WILL NEED FOR INSTALLATION:

You should have the following items available before proceeding with installation:

• External regulator (for propane/LPG and 1/2 lb. natural gas systems only)

Piping which complies with local codes

Sediment trap (recommended)

Screwdriver

Tee joint.

• Pipe sealant approved for use with propane/LPG (Resistant to sulfur compounds)

Drill with 5/32 masonry bit

• Pipe wrench or appropriate size crescent wrench set

Manual shutoff valve

 

 

70D0004

5

Image 5
Contents What to do if YOU Smell GAS Read and Save These InstructionsContents Owner Important Safety InformationInstaller Massachussetts Residents only Make Sure YOU have Received ALL Parts What YOU will Need for InstallationGetting Started Product Features and Specifications Adequate Combustion and Ventilation AIR General Installation InformationCodes BTU / Hr = Hearth Minimum Dimension Fireplace and Hearth DimensionsHeight of Restriction Minimum Depth of Fireplace/Firebox Placement in a Fireplace with a Restrictive BarrierSidewall and Ceiling Clearances Clearances and Height RequirementsClearances and Height Requirements Measuring Heat Resistant Material for Mantel Minimum Mantel Clearance with No Hood -TPB18 Mum of 10 at a minimum of 28 above the opening Minimum Clearance above Combustible Flooring Floor ClearanceBefore Fully Installing the Unit Installing Vented ApplicationsBefore Installing the Appliance Damper Stop InstallationPlacing and Securing Appliance Installing Vented ApplicationsAssembly Procedure Flexible Tube Manual Shutoff Gas Supply Inlet Valve Connecting the GASMILLI-VOLT Valve Control Figure Checking GAS PressureATE Electrical Wiring MILLI-VOLTConnecting Optional Wall Switch or Thermostat Complete MILLI-VOLT System Check Connecting Remote ReceiverChecking System Operation Installing Charred Timber Logs on Burner LOG PlacementInstalling Left Base Log #3 Installing Left Top Log #5 Placing Rock Wool Installing Right Top Log #6Steel BAR Grate Installation Riser and Steel BAR Grate InstallationOptional Riser Installation Andiron Installation Optional Cast Iron Grate and Andiron InstallationCast Iron Grate Installation Placing the Decorative Rock Flame AppearanceChecking the Pilot Flame MILLI-VOLT Control and Thermostat ControlOperating Instructions Checking the Burner FlameWhat to do if YOU Smell GAS Operating InstructionsTo Turn OFF GAS to Heater Cleaning and Servicing Operating Instructions and Cleaning and ServicingObserved Problem Possible Cause Remedy TroubleshootingODS/pilot lights, but flame Burner Assembly Replacement PartsAccessories Sold Separately Replacement Parts ListCTCL18 CTCL24 CTCL30 Charred Timber Logs70D0004 Carbon Monoxide Detector Requirements Special Requirements Basic Warranty Lifetime WarrantyFive Year Warranty