HORIZONTAL VENTING INSTALLATION
FOR SAFE AND PROPER OPERATION OF THE STOVE, FOLLOW THE VENTING INSTRUCTIONS EXACTLY.
ALL HORIZONTAL VENT RUNS MAY HAVE A 0" RISE
PER FOOT.
FOR OPTIMUM PERFORMANCE IT IS RECOMMENDED THAT ALL HORIZONTAL RUNS HAVE A MINIMUM
¼ INCH RISE PER FOOT.
ALL INNER EXHAUST AND OUTER INTAKE VENT PIPE JOINTS MAY BE SEALED USING EITHER RED RTV HIGH TEMP SILICONE SEALANT OR BLACK HIGH TEMP MILL PAC WITH THE EXCEPTION OF THE FIREPLACE EXHAUST FLUE COLLAR WHICH MUST BE SEALED USING MILL PAC (NOT SUPPLIED).
1.Stretch the 4" diameter aluminium flexible liner to the re- quired length taking into account the additional length needed for the finished wall surface.
Spacers are attached to the 4" inner flex liner at predetermined intervals to maintain a
Slip a 4" diameter length of aluminium flexible liner a minimum of 2" over the inner sleeve of the air terminal. Secure to the sleeve using 3 screws. Seal the joint and screw heads using the high temperature sealant.
2.Slip the first section of 7" diameter stove pipe a minimum of 2" over the outer sleeve of the air terminal. Secure to the sleeve using 3 screws. Seal the joint and screw heads using high temperature sealant.
3.Insert the liners through the firestop / vent pipe shield. Holding the air terminal (lettering in an upright, readable position), secure to the exterior wall. Make weather tight by sealing with caulking (not supplied). The air terminal mounting plate may be recessed (up to 1½" maximum) into the exterior wall or siding.
4.If more than one length of liner needs to be used to reach the stove, couple them together as illustrated in FIGURE 21. Seal the joints using the same procedure as described above.
The vent system must be supported approximately every 10 feet along a horizontal run. Use supports or equivalent
CAULKING
4"FLEX
FIGURE 20 | ATTENTION | HOT | |
| CAUTION | - | CHAUD |
| - |
|
7" RIGID
PIPE
#8x1/2" | - | |
SEALANT | SEALANT | |
| SELF DRILLING |
|
| SCREWS & |
|
| WASHERS |
|
4"COUPLER
FIGURE 21
7" RIGID PIPE
7" RIGID PIPE | 4"FLEX |
| PIPE |
17
VERTICAL VENTING INSTALLATION
1.Fasten the roof support to the roof using the screws provided. The roof support is optional. In this case the venting is to be adequately supported using either an
alternate method suitable to the authority having jurisdiction or the optional roof support.
2. Stretch the inner aluminum flex liner to the required length. Slip the liner a minimum of 2” over the inner sleeve of the air terminal connector and secure with 3 #8 screws. Seal using a heavy bead of the high temperature sealant.
3.Repeat using the outer aluminum flex liner.
4. Thread the air terminal connector / liner assembly down through
the roof. The air terminal must be located vertically and plumb. Attach the air terminal connector to the roof support, ensuring that the top of the air terminal is 16” above the highest point that it penetrates the roof.
5.Remove nails from the shingles, above and to the sides of the chimney. Place the
flashing over the air terminal connector leaving a min. 3/4”
of the air terminal connector |
|
|
showing above the top of the | 2” | AIR INLET |
flashing. Slide the flashing |
| BASE |
|
| |
underneath the sides and upper |
| CAULKING |
edge of the shingles. Ensure |
| |
| STORM COLLAR | |
that the air terminal connector |
| |
|
|
is properly centred within the flashing, giving a 3/4” margin
all around. Fasten to the roof. Do not nail through the lower
portion of the flashing. Make
the terminal and air terminal connector, place the terminal over the air terminal connector
making sure the liner goes into the hole in the terminal. Secure with the three screws provided.
7.Apply a heavy bead of weatherproof caulking 2 inches above the flashing. Note: Maintain a minimum 2” space between the air inlet base and the storm collar. Install the storm collar around the air terminal and slide down to the caulking. Tighten to ensure that a weather- tight seal between the air terminal and the collar is achieved.