Vanguard Heating PM200, PM400 operation manual Operating Sequence

Page 14

OPERATING SEQUENCE

The booster heater is designed to produce 180-190 degree sanitizing rinse water for commercial dishwashing machines. Specific performance depends upon the exact water flow and supply water temperature. (See table)

 

PowerMax200tm Performance Data

 

Temperature rise

Gallons per Minute

Gallons per Hour

40o F

8.7

520

50o F

7.0

420

60o F

5.8

348

70o F

5.0

300

140o F

2.5 (7.5 for 15 sec. Per minute) 150

After the necessary power, water, gas and vent connections are completed correctly and all air is purged from gas and water piping, the unit is started by turning on the power switch located on the top, front of the left side panel. The combustion air fan will start and run continuously and the digital temperature display will light, showing the water temperature in the accumulator tank. If the tank temperature sensor detects water temperature below the set point, it will turn on the internal circulating pump, prove water flow, combustion air flow and hi-limit compliance and activate the hot surface igniter. Following a 3 second warm up for the igniter, the gas valve opens and the burner ignites. If the burner flame is not proved within a few seconds, the gas valve automatically closes. This cycle will repeat 3 times. If ignition/flame is not proved the control will go into automatic lock-out, requiring a re-set. Re-set is accomplished by turning power switch to ‘off’ for 10 seconds and then turning back on. When the tank water temperature exceeds the thermostat set point, the burner will shut off until the next call for heat.

The internal circulating pump will operate whenever the thermostat is calling for heat. The combustion air blower operates continuously whenever the ‘on-off’ switch is on.

The operating temperature control is factory-set and is not to be user-adjusted. If temperature rise is not satisfactory, call your service agency and/or call the factory.

12

Image 14
Contents GAS INFRA-RED Water Booster Heaters Important for Your SafetyDo not Discard this Manual What to do if YOU Smell GASTable of Contents General Information Unpacking Installation CodesInstallation Clearances Exhaust Venting Page Examples of Acceptable Vent PIPING/ See Appendix a GAS PipingWater Requirements Water Piping Page Electrical Page Page Operating Sequence Fill the Booster Heater Check Electric ControlsFor Your SAFETY, Read Before Operating Operating InstructionsTo Turn OFF GAS to Appliance Maintenance Trouble Shooting Problem Cause RemedyReplacement Parts List PART# DescriptionLimited Warranty Vanguard TECHNOLOGY, INCAppendix a Typical Special Stainless Steel Venting Clearance to Combustibles See illustration #1 belowSide Wall Venting Installation Side Wall Venting InstallationVertical Venting Factory Authorized PowerMax Start-Up Verification Worksheet Vanguard Technology Inc