Vanguard Heating PM400, PM200 operation manual Clearance to Combustibles, See illustration #1 below

Page 23

Appendix A

JOINT PROCEDURE

(see illustration #1 below)

1.The outside of male end and inside of female end of pipe must be cleaned before applying silicone bead. Remove dirt, grease, and moisture from surface to be sealed. Dry surface or allow to dry thoroughly.

2.Apply high temperature silicone approximately one half inch from end around male end of pipe and along both sides of seam for one inch in an even 1/4” bead as per illustration #1.

3.Pipes can now be pushed together as far as they will go. The seams on pipes should be aligned and oriented upwards in all horizontal applications. Apply another bead of silicone around this joint and smooth out.

4.Tighten gear clamps (15 [N/LB. MAX.).

5.Check all joints and seams for tightness prior to using vent system.

6.Allow the sealant to cure for one hour before operating the appliance. Length of time required for full cure depends upon thickness of application and other factors such as weather, ambient temperature, humidity, etc. All sealants must be used within the time limitations marked.

CLEARANCE TO COMBUSTIBLES

SYSTEM

CLEARANCE

CLEARANCE

SEALANT

OPERATING

ENCLOSED

UNENCLOSED

REQUIRED

 

 

 

HORIZONTAL

VERTICAL

HORIZONTAL

VERTICAL

 

 

 

 

 

 

 

 

G.E 108

300OF (149OC)

8” (200 mm)

4” (100 mm)

1” (25 mm)

1” (25 mm)

DOW CORNING 732

 

 

 

 

 

 

 

Z-FLEX Z-VENT

 

 

 

 

 

 

 

SEALANT

 

 

 

 

 

 

 

G.E 106

480

O

O

8” (200 mm)

4” (100 mm)

1” (25 mm)

N/A

Z-FLEX Z-VENT

 

F (249 C)

SEALANT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*Note: Flexible elbows parts # SVEFEX03 AND SVEFEX04 must not be enclosed

 

 

 

 

 

 

 

 

21

Image 23
Contents What to do if YOU Smell GAS Important for Your SafetyDo not Discard this Manual GAS INFRA-RED Water Booster HeatersTable of Contents General Information Unpacking Installation CodesInstallation Clearances Exhaust Venting Page GAS Piping Examples of Acceptable Vent PIPING/ See Appendix aWater Requirements Water Piping Page Electrical Page Page Operating Sequence Check Electric Controls Fill the Booster HeaterOperating Instructions For Your SAFETY, Read Before OperatingTo Turn OFF GAS to Appliance Maintenance Problem Cause Remedy Trouble Shooting PART# Description Replacement Parts ListVanguard TECHNOLOGY, INC Limited WarrantyAppendix a Typical Special Stainless Steel Venting See illustration #1 below Clearance to CombustiblesSide Wall Venting Installation Side Wall Venting InstallationVertical Venting Factory Authorized PowerMax Start-Up Verification Worksheet Vanguard Technology Inc