Hubbell Electric Heater Company HE, HSE manual Immersion Thermostat

Page 17

IMMERSION THERMOSTAT

1.Disconnect power from unit.

2.Remove access cover and locate thermostat.

3.Remove high limit cover screw and cover.

Cover

Cover Screw

4. Disconnect the two (2) 14 gauge wires.

Wires

Capillary Tube

5.Remove capillary tube and bulb from thermowell.

6.Remove two (2) mounting screws.

Mounting Screws

7.Replace thermostat using reverse procedure. (Note: Be sure to place capillary tube into slot in base prior to installing cover.)

17

Image 17
Contents Electric Heater Company STRATFORD, CT Hubbell Electric Heater CompanyTable of Contents Section Title Page Tank Section I General Description and ConstructionTank Connections Control ThermostatHeating Element Temperature High Limit SwitchOuter Shell and Insulation Magnetic Contactor HSE Models OnlyWater Heater Placement Section II InstallationPiping Installation Final Checks Electrical InstallationFilling the Heater Maintenance and Operation Section III Scheduled Maintenance and OperationFreezing Quarterly InspectionAnnual Inspection Symptom Probable Cause Corrective Action / Remedy Section IV TroubleshootingSurface Temperature High Limit CUT-OFF Section V Servicing & Replacement of PartsHeating Element Page Immersion Thermostat Magnetic Contactor Relief Valve Delta WYE Single Phase Element Chart Torque Values