Hubbell Electric Heater Company HSE, HE manual Section II Installation, Water Heater Placement

Page 8

SECTION II – INSTALLATION

WARNING / CAUTION

DO NOT TURN ON THE ELECTRIC POWER SUPPLY to this equipment until heater is completely filled with water and all air has been released. If the heater is NOT filled with water when the power is turned on, the heating elements will burn out.

For protection against excessive pressures and temperatures, local codes require the installation of a temperature-and-pressure (T&P) relief valve certified by a nationally recognized laboratory that maintains periodic inspection of production of listed equipment of materials, as meeting the requirements for Relief Valves and Automatic Gas Shutoff for Hot Water Supply Systems. ANSI Z21.22-1971. THE CUSTOMER IS RESPONSIBLE TO PROTECT PROPERTY AND PERSONNEL FROM HARM WHEN THE VALVE FUNCTIONS.

All water heaters have a risk of leakage at some unpredictable time. IT IS THE CUSTOMER'S RESPONSIBILITY TO PROVIDE A CATCH PAN OR OTHER ADEQUATE MEANS, SO THAT THE RESULTANT FLOW OF WATER WILL NOT DAMAGE FURNISHINGS OR PROPERTY.

WATER HEATER PLACEMENT

1.Locate heater in a dry location nearest to the point of most frequent hot water use.

2.Mount tank using 3/8” diameter threaded rod (not supplied) to suitable ceiling supports (not supplied).

3.Install 3/8” diameter threaded rod (not supplied) into the four (4) mounting assemblies on the tank.

4.Install drip pan, if supplied.

5.The water heater should be protected from freezing and waterlines insulated to reduce energy and water waste.

6.Leave a minimum of 13” clearance for element withdrawal, if necessary.

7.Do not install in an area where flammable liquids or combustible vapors are present.

8

Image 8
Contents Electric Heater Company Hubbell Electric Heater Company STRATFORD, CTTable of Contents Section Title Page Section I General Description and Construction TankTank Connections Control ThermostatTemperature High Limit Switch Heating ElementMagnetic Contactor HSE Models Only Outer Shell and InsulationSection II Installation Water Heater PlacementPiping Installation Final Checks Electrical InstallationFilling the Heater Section III Scheduled Maintenance and Operation Maintenance and OperationFreezing Quarterly InspectionAnnual Inspection Section IV Troubleshooting Symptom Probable Cause Corrective Action / RemedySection V Servicing & Replacement of Parts Surface Temperature High Limit CUT-OFFHeating Element Page Immersion Thermostat Magnetic Contactor Relief Valve Delta WYE Single Phase Element Chart Torque Values