3 Installation
!
i
Please take note of the safety information in the chapter "Important notes".
Do not expose the server to extreme environmental conditions (see section "Technical data"). Protect it from dust, humidity and heat.
There must be a clearance of at least 200 mm in front of and behind the server to ensure adequate ventilation. Do not cover the ventilation areas of the monitor and the server.
3.1Installation steps
ÊUnpack the server (see next section ”Unpacking the server”).
ÊSet up the floorstand server or mount the rack server in the rack (see layout diagram on the order lists created with the Rack Architect programm).
ÊAttach the cables to the server according to the (rack) configuration required. Please also refer to section ”Instructions on connecting and disconnecting cables ”.
ÊWhen mounting the rack version, refer to the information in section ”Installing
ÊConnect the server to the power supply (see section ”Connecting the tower server to the line voltage” and ” Connecting the rack server to the line voltage”).
3.2Unpacking the server
! | Please take note of the safety information in the chapter "Technical data". | |
Do not unpack the server until all transportation maneuvers are completed. | ||
|
It is recommended not to throw away the original packaging material! It may be required for transportation at some later date.
ÊUnpack all the individual parts.
ÊCheck the delivery for damage incurred during transportation.
ÊCheck whether the delivery agrees with the details in the delivery note.
ÊCheck whether all necessary details have been entered on the first page of the guarantee coupon booklet.
The identification rating plate is located on the server on the upper rear area.
Should you discover that the delivery does not correspond to the delivery note, notify your supplier immediately.
11 |