Preparation for use and operation

Unlocking/locking the tower server

Enabling access to the hard disk drives

2

1

 

4

 

3

 

ÊUnlock the server (1).

ÊSlide up the drive cover as far as possible (2).

ÊRemove the hard disk cover toward the front (3 + 4).

The hard disk cover is remounted and the server connected in the reverse order.

24

A26361-K646-Z102-1-7619

Page 32
Image 32
Fujitsu B120 manual Preparation for use and operation, Enabling access to the hard disk drives