Williams 1773511, 1773512 installation instructions A + 33.3 mm

Page 7
A + 33.3 mm

5.Install the supporting bracket to the wall; insert the air pipe in the wall through the hole provided in the support bracket. Place the round adhesive gasket around the hole so that the air pipe remains in position. (Figure 3)

6.Attach the supporting bracket with the screws. If possible use self-tapping screws. If self-tapping screws cannot be used, use the plastic anchors provided.

7.Loosen the screws, remove the casing and disconnect the case grounding wire. (Figure 4)

Figure 2

A + 33.3 mm

A + 2.3

Figure 3

Ø 49.2

H

Figure 4

8.Place the adhesive spongy lining behind the unit. (Figure 4)

9.Attach the flue exhaust pipe end (diameter 1-3/8”) on the furnace male pipe connection (Figure 5). BE SURE THAT THE RUBBER SILCONE O-RING GASKET IS IN POSITION.

10.Install the unit to the wall leaning the bottom edge of panel “C” (where the fan is located) on the supporting frame. (Figure

6)Attach the furnace to the support bracket with the two screws.

11.When inside installation is complete, proceed to the location of the vent cap on the external wall. The vent cap should perfectly match the pipe end. Mark the location of the three holes for the screw anchors. (Figure 7) The flue grid must be vertical.

6

Image 7
Contents Direct-Vent Wall Furnace Williams Furnace Co., 250 West Laurel Street, Colton, CA 92324 U.S.AInstructions to Installer Table of Contents General Information and Technical DataThat’s your signal to go into immediate action Safety Rules and General WarningsSafety Information for Users of LP Gas LP Gas Warning OdorSome Points to Remember Technical DataWall Installation InstallationAir inlet tube length = wall thickness + 3/32-inches 2.4 mm Outside Location for Vent TerminalFlue outlet tube length = wall thickness + 1-5/16-inches 7.9 mm A + 33.3 mm 13. Relocate the vent cap and attach it with the screws. Figure Nozzle Diameter Gas ConversionsGas Type Nozzle Part NumberGas Supply High Altitude AdjustmentInstalling a New Main Gas Shutoff Valve Pressure Testing of the Gas Supply SystemA B C First Firing the FurnaceChecking the Gas Inlet Pressure Checking the Gas Manifold PressureElectrical Wiring Diagram Key TO TURN OFF GAS TO APPLIANCE FOR YOUR SAFETY READ BEFORE OPERATINGOperating Instructions OPERATING INSTRUCTIONSUSING THE FEATURES OF YOUR FURNACE HOW TO SHUT OFF THE APPLIANCEWHAT TO DO IF THE RED LAMP IS LIT Lubrication of Moving Parts Checking and Adjusting the Gas Manifold PressureServicing Checking, Removing and Reassembling of the Vent Air Intake SystemAnnual Maintenance Requirements Overview Programmable TimerManual Operation Setting and Adjustment Initial ConditionsDay and Time Setting Programming the TimerSkip Function Procedure During Operation Cancelling a Single ProgramCancelling of all Preset Programs Using the Skip FunctionSummer Mode Step Troubleshooting Starting Sequence ElectricalTroubleshooting Step StepStep Starting Sequence Gas Gas Assembly Replacement PartsElectric Box Part NumberJLTT015 Part Number JLTT023 Part Number JMTR017 RP8 Flame Sensor RP7 Spark Igniter 2 piecesS - Combustion Blower Motor M1 - Overheat Thermostat M2 - Fan Thermostat Fan Blades 4 pieces M - Fan Motor 2 Pieces