Williams 1773511, 1773512 installation instructions Replacement Parts, Electric Box, Gas Assembly

Page 23
Replacement Parts

Replacement Parts

 

 

TR – 120/24V Transformer

Part Number: JTRS017

 

 

 

 

 

 

Ignition Control Box

Part Number: JCNT019

 

 

 

 

 

 

NP – Pressure Switch

Part Number: JPRS010

 

 

 

 

 

 

Z9 – Room Thermostat

Part Number: JTLT005

 

 

 

 

 

 

Z1 – Reset and Summer/Winter

Part Number: NTST000

 

 

Switch

 

 

 

 

 

 

 

 

 

Z8-Z3 – Timer and Manual-

Part Number: N19800202

 

 

Program Mode Switch

 

 

 

 

 

 

 

 

 

Z2- Hi-Lo Flame and Fan Speed

Part Number: N19800201

 

 

Switch

 

 

 

Electric Box

 

 

 

 

SF/SB – Green and Red Lamps

Part Number:

 

 

 

 

ELMP006 – ELMP007

 

 

 

 

 

 

 

 

 

Z8 - Timer

Part Number:

 

 

E-PRG005

 

 

 

 

Gas Assembly

 

Gas Burner and Gas Nozzle

Part Number: JPRT010

 

 

 

 

 

 

 

 

Natural Gas Nozzle

Part Number: JGLL065

 

 

LP Gas Nozzle

Part Number: JGLL067

EV1/2 – Min/Max Gas Valve

Part Number: GVLV022

22

Image 23
Contents Direct-Vent Wall Furnace Williams Furnace Co., 250 West Laurel Street, Colton, CA 92324 U.S.AInstructions to Installer Table of Contents General Information and Technical DataThat’s your signal to go into immediate action Safety Rules and General WarningsSafety Information for Users of LP Gas LP Gas Warning OdorSome Points to Remember Technical DataWall Installation InstallationFlue outlet tube length = wall thickness + 1-5/16-inches 7.9 mm Outside Location for Vent TerminalAir inlet tube length = wall thickness + 3/32-inches 2.4 mm A + 33.3 mm 13. Relocate the vent cap and attach it with the screws. Figure Nozzle Diameter Gas ConversionsGas Type Nozzle Part NumberGas Supply High Altitude AdjustmentInstalling a New Main Gas Shutoff Valve Pressure Testing of the Gas Supply SystemA B C First Firing the FurnaceChecking the Gas Inlet Pressure Checking the Gas Manifold PressureElectrical Wiring Diagram Key TO TURN OFF GAS TO APPLIANCE FOR YOUR SAFETY READ BEFORE OPERATINGOperating Instructions OPERATING INSTRUCTIONSWHAT TO DO IF THE RED LAMP IS LIT HOW TO SHUT OFF THE APPLIANCEUSING THE FEATURES OF YOUR FURNACE Lubrication of Moving Parts Checking and Adjusting the Gas Manifold PressureServicing Checking, Removing and Reassembling of the Vent Air Intake SystemAnnual Maintenance Requirements Overview Programmable TimerManual Operation Setting and Adjustment Initial ConditionsDay and Time Setting Programming the TimerSkip Function Procedure During Operation Cancelling a Single ProgramCancelling of all Preset Programs Using the Skip FunctionSummer Mode Step Troubleshooting Starting Sequence ElectricalTroubleshooting Step StepStep Starting Sequence Gas Electric Box Replacement PartsGas Assembly Part NumberJLTT015 Part Number JLTT023 Part Number JMTR017 RP8 Flame Sensor RP7 Spark Igniter 2 piecesS - Combustion Blower Motor M1 - Overheat Thermostat M2 - Fan Thermostat Fan Blades 4 pieces M - Fan Motor 2 Pieces