Williams 1773512, 1773511 installation instructions Starting Sequence Gas

Page 22
Starting Sequence (Gas)

Point 13 (TR)

No inlet voltage (120 V).

Check 5 pole connector and control box.

If everything is okay, first replace the connector and then the control box if problem remains.

No outlet voltage (24 V) during ignition.

Check wiring and connections.

If everything is okay, replace the transformer.

Point 14 (EV1)

Valve closed during ignition.

Check wiring, connections and voltage.

If everything is okay, replace the gas valve.

Point 15 (RP7)

No spark during ignition.

Check electrode, wiring and connections.

If everything is okay, replace the flame control box.

Point 16 (RP8) No flame sensing.

Check flame sensor, wiring and connections. Check gas pressure and exhaust flue pipe.

If everything is okay, replace the flame control box.

Point 17 (EV2)

No voltage on EV2 with switch Z2 up.

Check wiring and connections.

If everything is okay, replace the switch.

Valve closed with voltage with Z2 up.

Check wiring, connections and voltage.

If everything is okay, replace the gas valve.

Starting Sequence (Gas)

1.Check and clean exhaust flue pipes;

2.Check and clean air blower and fan motor;

3.Check and clean burner and combustion chamber;

4.Check and clean gas nozzle;

5.Check gas type;

6.Check supply gas line pressure (see the manual);

7.Check gas losses;

8.Set burner gas pressure (see the manual).

21

Image 22
Contents Williams Furnace Co., 250 West Laurel Street, Colton, CA 92324 U.S.A Direct-Vent Wall FurnaceTable of Contents General Information and Technical Data Instructions to InstallerLP Gas Warning Odor Safety Rules and General WarningsSafety Information for Users of LP Gas That’s your signal to go into immediate actionTechnical Data Some Points to RememberInstallation Wall InstallationAir inlet tube length = wall thickness + 3/32-inches 2.4 mm Outside Location for Vent TerminalFlue outlet tube length = wall thickness + 1-5/16-inches 7.9 mm A + 33.3 mm 13. Relocate the vent cap and attach it with the screws. Figure Nozzle Part Number Gas ConversionsGas Type Nozzle DiameterPressure Testing of the Gas Supply System High Altitude AdjustmentInstalling a New Main Gas Shutoff Valve Gas SupplyChecking the Gas Manifold Pressure First Firing the FurnaceChecking the Gas Inlet Pressure A B CElectrical Wiring Diagram Key OPERATING INSTRUCTIONS FOR YOUR SAFETY READ BEFORE OPERATINGOperating Instructions TO TURN OFF GAS TO APPLIANCEUSING THE FEATURES OF YOUR FURNACE HOW TO SHUT OFF THE APPLIANCEWHAT TO DO IF THE RED LAMP IS LIT Checking, Removing and Reassembling of the Vent Air Intake System Checking and Adjusting the Gas Manifold PressureServicing Lubrication of Moving PartsAnnual Maintenance Requirements Programmable Timer OverviewProgramming the Timer Setting and Adjustment Initial ConditionsDay and Time Setting Manual OperationUsing the Skip Function Cancelling a Single ProgramCancelling of all Preset Programs Skip Function Procedure During OperationStep Troubleshooting Starting Sequence ElectricalTroubleshooting Step Summer Mode StepTroubleshooting Step Starting Sequence Gas Gas Assembly Replacement PartsElectric Box M2 - Fan Thermostat Fan Blades 4 pieces M - Fan Motor 2 Pieces RP8 Flame Sensor RP7 Spark Igniter 2 piecesS - Combustion Blower Motor M1 - Overheat Thermostat Part NumberJLTT015 Part Number JLTT023 Part Number JMTR017